403832984 | Form 17 | 6/21/2024 | 6/24/2024 | | 9 | CONTINUOUS | GAS | 0 | NO FLOW | 527 | 527 | No | -- | -- | PRE-P/A Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 2/1/2024 | 3/19/2024 | Plunger Lift | 14 | Continuous | None | -- | No Flow | 518 | 518 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 6/22/2023 | 7/17/2023 | Plunger Lift | 23 | Continuous | None | -- | No Flow | 529 | 529 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 6/29/2022 | 7/11/2022 | Plunger Lift | 26 | Continuous | None | -- | No Flow | 533 | 533 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 7/28/2021 | 8/23/2021 | Plunger Lift | 20 | Continuous | None | -- | No Flow | 508 | 509 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 6/18/2020 | 11/2/2020 | | 24 | Continuous Flow | | 0 | Down To Zero | 0 | 0 | No | No | No | Tubing and Casing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 2/20/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 1985 | 1985 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
400857301 | Form 17 | 6/11/2015 | 6/23/2015 | PLUNGER LIFT | 40 | GAS | -- | 0 | DOWN TO 0 | 324 | 324 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, WHISPER. INITIAL POST REMEDIATION BLOW DOWN ON 6-5-2015 STARTED WITH 133 PSI AND BLEW DOWN TO ZERO PSI. |
400647648 | Form 17 | 7/16/2014 | 7/21/2014 | PLUNGER LIFT | 430 | GAS | -- | 190 | GAS | 502 | 510 | No | -- | -- | SC PRODUCED NO FLUID. BLEW DOWN WELL AN ADDITIONAL 30 MINS. ENDING PRESSURE WAS #76 |
400292260 | Form 17 | 4/27/2012 | 6/5/2012 | PLUNGER LIFT | 433 | GAS | -- | 340 | GAS | 420 | 446 | No | -- | -- | No fluid was produced during 30 minute blow down |