Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30565
Well Classification: OW Status: PA - 9/26/2024
Well Name/No:ADAM FARM #27-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/26/2024
FacilityID:412871LocationID:318150
Municipality/County:FIRESTONE / WELD #123Location:SWNE 4 2N68W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Planned Location:1321FNL  1596 FELLat/Long: 40.171330 / -105.004090Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.171329 / -105.004090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/26/2024             Measured TD: 7697 ft.    Vertical TD: 7537 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/26/2024
Wellbore PermitDIRECTIONAL
Permit #:20092462 Expiration Date:7/27/2011
Proposed Top PZ Location:Sec:4 Twp: 2N 68W Footage: 69 FNL  1333 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68W Footage: 69 FNL  1333 FEL
Proposed Depth/Form:7616 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:10/9/2009
Spud Date:10/6/2009Spud Date Is:ACTUAL
Measured TD:7697 ft.Measured PB depth:7646 ft.
True Vertical TD:7537 ft.True Vertical PB depth:7486 ft.
Top PZ Location:Sec:4 Twp: 2N 68WFootage: 69 FNL  1333 FEL
Bottom Hole Location:Sec:4 Twp: 2N 68WFootage: 60 FNL  1338 FEL
Log Types:P/E AILC-CNLD-ML, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 974 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 974 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7682 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 819, Top: 1410 ft., Bottom: 7682 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 704 ft., Bottom: 1302 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3687 ft.NN
SUSSEX4170 ft.NN
SHANNON4704 ft.NN
NIOBRARA7224 ft.NN
FORT HAYS7482 ft.NN
CODELL7500 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/14/2009                 Interval Top: 7503 ft.    Interval Bottom: 7523 ft.

 Completed Information for Formation CODELL
1st Production Date:1/11/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/12/2009
Treatment Summary:195,930 GALS FLUID & 150,000 LBS 40/70 SAND & 4,000 LBS 20/40 EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7503 ft.# Of Holes:60
Interval Bottom:7523 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/26/2024                 Interval Top: 7238 ft.    Interval Bottom: 7523 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/11/2010Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/16/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1435
CALC_BBLS_H2O 0
CALC_BBLS_OIL 66
CALC_GOR 2349
CALC_MCF_GAS 155
CASING_PRESS 1800
GRAVITY_OIL 51
Perforation Data:
Interval Top:7238 ft.# Of Holes:132
Interval Bottom:7523 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/14/2009                 Interval Top: 7238 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/11/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/16/2009
Treatment Summary:500 GALS ACID & 236,445 GALS FLUID & 200,740 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7238 ft.# Of Holes:72
Interval Bottom:7382 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/26/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No