| 404411934 | Form 17 | 10/16/2025 | 10/28/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 530 | 530 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 2/3/2025 | 2/10/2025 | | 0 | | -- | 0 | | 144 | 145 | No | No | No | |
| Click for Specifics | Full | 2/12/2024 | 2/26/2024 | Plunger Lift | 0 | No Flow | -- | 0 | No Flow | 524 | 524 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/20/2023 | 3/15/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 589 | 589 | No | None | None | |
| Click for Specifics | Full | 8/11/2022 | 9/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 588 | 588 | No | None | None | |
| Click for Specifics | Full | 3/5/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 548 | 555 | No | None | None | |
| Click for Specifics | Light | 8/9/2020 | 12/3/2020 | | 2 | | -- | 0 | No Flow | 512 | 512 | No | No | No | |
| Click for Specifics | Light | 6/13/2019 | 11/27/2019 | | 0 | | | 0 | | 638 | 638 | No | No | No | |