Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29704
Well Classification: GW Status: PA - 11/7/2025
Well Name/No:Phillips #23-1-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/7/2025
FacilityID:300380LocationID:322543
Municipality/County:GREELEY / WELD #123Location:SWNE 23 5N67W 6
Field:WATTENBERG - #90750Elevation:4965 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1930FNL  1624 FELLat/Long: 40.386970 / -104.856770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.386970 / -104.856770Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/19/2011
End Date: 8/19/2011
Reported: 11/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 80
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/7/2025             Measured TD: 7659 ft.    Vertical TD: 7597 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/7/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/4/2012
Proposed Top PZ Location:Sec:23 Twp: 5N 67W Footage: 2541 FNL  1315 FEL
Bottom Hole Location:Sec:23 Twp: 5N 67W Footage: 2541 FNL  1315 FEL
Proposed Depth/Form:7624 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 210, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7624 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 713, Top: , Bottom: 7624 ft.

Wellbore Completed
Completion Date:6/16/2011
Spud Date:6/13/2011Spud Date Is:ACTUAL
Measured TD:7659 ft.Measured PB depth:7606 ft.
True Vertical TD:7597 ft.True Vertical PB depth:7594 ft.
Top PZ Location:Sec:23 Twp: 5N 67WFootage: 2524 FNL  1363 FEL
Bottom Hole Location:Sec:23 Twp: 5N 67WFootage: 2522 FNL  1364 FEL
Log Types:CBL/GRL/CCL, SDL/DSNL/ACL/TRL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 560 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 560 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7650 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 1950 ft., Bottom: 7650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7151 ft.
FORT HAYS7486 ft.
CODELL7507 ft.
GREENHORN7600 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/4/2013                  Interval Top: 7511 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation CODELL
1st Production Date:7/27/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2011
Treatment Summary:Frac'd Cdl w/131321 gals Silverstim and Slickwater and 248758# Ottawa sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 11
BTU_GAS 1255
CALC_BBLS_H2O 7
CALC_BBLS_OIL 11
CALC_GOR 22000
CALC_MCF_GAS 242
CASING_PRESS 520
GRAVITY_OIL 62
MCF_GAS 242
Perforation Data:
Interval Top:7511 ft.# Of Holes:88
Interval Bottom:7533 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/7/2025                 Interval Top: 7171 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/19/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:Nio-Cdl commingled
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2011Test Method:Flowing
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1255
CALC_BBLS_H2O 1
CALC_BBLS_OIL 8
CALC_GOR 12
CALC_MCF_GAS 100
GRAVITY_OIL 52
Perforation Data:
Interval Top:7171 ft.# Of Holes:136
Interval Bottom:7533 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/14/2013                 Interval Top: 7171 ft.    Interval Bottom: 7319 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/19/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/19/2011
Treatment Summary:Perfs Nio A 7171-7183, Nio B 7307-7319. Frac'd with 169764 gal Silverstim and Slickwater with 251543# Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7171 ft.# Of Holes:48
Interval Bottom:7319 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/07/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)300
Total Gas Produced (MCF)5106
GOR17020
GOR DeterminationMCFE
Average BOE per Day3.206
Average MCFE per Day18.600

 Federal Financial Assurance  i 

 Tribal Well  i No