Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29704
Well Classification: GW Status: PA - 11/7/2025
Well Name/No:Phillips #23-1-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/7/2025
FacilityID:300380LocationID:322543
Municipality/County:GREELEY / WELD #123Location:SWNE 23 5N67W 6
Field:WATTENBERG - #90750Elevation:4965 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1930FNL  1624 FELLat/Long: 40.386970 / -104.856770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.386970 / -104.856770Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/19/2011
End Date: 8/19/2011
Reported: 11/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 80
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/7/2025             Measured TD: 7659 ft.    Vertical TD: 7597 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/7/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/4/2012
Proposed Top PZ Location:Sec:23 Twp: 5N 67W Footage: 2541 FNL  1315 FEL
Bottom Hole Location:Sec:23 Twp: 5N 67W Footage: 2541 FNL  1315 FEL
Proposed Depth/Form:7624 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 210, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7624 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 713, Top: , Bottom: 7624 ft.

Wellbore Completed
Completion Date:6/16/2011
Spud Date:6/13/2011Spud Date Is:ACTUAL
Measured TD:7659 ft.Measured PB depth:7606 ft.
True Vertical TD:7597 ft.True Vertical PB depth:7594 ft.
Top PZ Location:Sec:23 Twp: 5N 67WFootage: 2524 FNL  1363 FEL
Bottom Hole Location:Sec:23 Twp: 5N 67WFootage: 2522 FNL  1364 FEL
Log Types:CBL/GRL/CCL, SDL/DSNL/ACL/TRL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 560 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 560 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7650 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 1950 ft., Bottom: 7650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7151 ft.
FORT HAYS7486 ft.
CODELL7507 ft.
GREENHORN7600 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/4/2013                  Interval Top: 7511 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation CODELL
1st Production Date:7/27/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2011
Treatment Summary:Frac'd Cdl w/131321 gals Silverstim and Slickwater and 248758# Ottawa sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 11
BTU_GAS 1255
CALC_BBLS_H2O 7
CALC_BBLS_OIL 11
CALC_GOR 22000
CALC_MCF_GAS 242
CASING_PRESS 520
GRAVITY_OIL 62
MCF_GAS 242
Perforation Data:
Interval Top:7511 ft.# Of Holes:88
Interval Bottom:7533 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/7/2025                 Interval Top: 7171 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/19/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:Nio-Cdl commingled
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2011Test Method:Flowing
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1255
CALC_BBLS_H2O 1
CALC_BBLS_OIL 8
CALC_GOR 12
CALC_MCF_GAS 100
GRAVITY_OIL 52
Perforation Data:
Interval Top:7171 ft.# Of Holes:136
Interval Bottom:7533 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/14/2013                 Interval Top: 7171 ft.    Interval Bottom: 7319 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/19/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/19/2011
Treatment Summary:Perfs Nio A 7171-7183, Nio B 7307-7319. Frac'd with 169764 gal Silverstim and Slickwater with 251543# Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7171 ft.# Of Holes:48
Interval Bottom:7319 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/07/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)262
Total Gas Produced (MCF)4322
GOR16496
GOR DeterminationMCFE
Average BOE per Day2.741
Average MCFE per Day15.901

 Federal Financial Assurance  i 

 Tribal Well  i No