| 402088942 | Form 17 | 5/1/2019 | 6/26/2019 | PLUNGER LIFT | 59 | GAS | -- | 1 | WHISPER | 825 | 823 | No | -- | -- | Surface casing produced no fluids. 15 minute shut in resulted in 10 psi. 30 minute blow down resulted in whisper. Tubing shut in. |
| 400857270 | Form 17 | 6/5/2015 | 6/23/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 1312 | 1309 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD-UP, DEAD. INITIAL POST REMEDIATION BLOW DOWN ON 5-29-2015 STARTED WITH A WHISPER AND BLEW DOWN TO ZERO PSI. |
| 400353098 | Form 17 | 10/15/2012 | 12/3/2012 | PLUNGER LIFT | 6 | GAS | -- | 0 | DOWN TO 0 | 822 | 830 | No | -- | -- | No transducer to surface casing. |