Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27146
Well Classification: OW Status: PA - 10/1/2019
Well Name/No:RADEMACHER #38-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/1/2019
FacilityID:297452LocationID:336065
Municipality/County:FIRESTONE / WELD #123Location:SWSE 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1273FSL  1519 FELLat/Long: 40.193430 / -104.947190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.193456 / -104.947053Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/1/2019             Measured TD: 7845 ft.    Vertical TD: 7505 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/1/2019
Wellbore PermitDIRECTIONAL
Permit #:20083142 Expiration Date:7/29/2009
Proposed Top PZ Location:Sec:25 Twp: 3N 68W Footage: 48 FSL  82 FEL
Bottom Hole Location:Sec:25 Twp: 3N 68W Footage: 48 FSL  82 FEL
Proposed Depth/Form:7834 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:N/A
Spud Date:8/22/2008Spud Date Is:ACTUAL
Measured TD:7845 ft.Measured PB depth:7805 ft.
True Vertical TD:7505 ft.True Vertical PB depth:7465 ft.
Top PZ Location:Sec:25 Twp: 3N 68WFootage: 48 FSL  82 FEL
Bottom Hole Location:Sec:25 Twp: 3N 68WFootage: 48 FSL  82 FEL
Log Types:CBL, PNN/GR/PL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 910 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 0 ft., Bottom: 910 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7835 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 2810 ft., Bottom: 7835 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 770 ft., Bottom: 1530 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4000 ft.NN
SUSSEX4500 ft.NN
SHANNON4900 ft.NN
NIOBRARA7400 ft.NN
FORT HAYS7663 ft.NN
CODELL7685 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/1/2019                 Interval Top: 7668 ft.    Interval Bottom: 7688 ft.

 Completed Information for Formation CODELL
1st Production Date:10/16/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/2008
Treatment Summary:COMMINGLED AFTER THE NB RECOMPLETE.
Formation Treatment
Treatment Date:9/18/2008
Treatment Summary:131,027 GALS FLUID & 221,100# 20/40 SAND & 4000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1149
CALC_BBLS_OIL 12
CALC_GOR 3583
CALC_MCF_GAS 43
CASING_PRESS 1500
GRAVITY_OIL 51
Perforation Data:
Interval Top:7668 ft.# Of Holes:60
Interval Bottom:7688 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/1/2019                 Interval Top: 7408 ft.    Interval Bottom: 7688 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/18/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/22/2010
Treatment Summary:NB PERF 7408-7538 HOLES 62 SIZE 0.38 CD PERF 7668-7688 HOLES 60 SIZE 0.38
Tubing Size:2.375 in.Tubing Setting Depth:7643 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 9
BTU_GAS 1297
CALC_BBLS_OIL 9
CALC_GOR 4000
CALC_MCF_GAS 36
CASING_PRESS 1574
GRAVITY_OIL 51
MCF_GAS 36
TUBING_PRESS 461
Perforation Data:
Interval Top:7408 ft.# Of Holes:122
Interval Bottom:7688 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/24/2011                 Interval Top: 7408 ft.    Interval Bottom: 7538 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/18/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/22/2010
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 12,390 gal Slickwater. No proppant used on this job.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7408 ft.# Of Holes:62
Interval Bottom:7538 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/01/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No