| 401642303 | Form 17 | 5/11/2018 | 5/16/2018 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | -- | -- | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with a whisper. Both tubing and production casing were LOTO. |
| 400965223 | Form 17 | 12/16/2015 | 1/6/2016 | | 0 | DOWN TO 0 | -- | 0 | DOWN TO 0 | 538 | 543 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. INITIAL POST REMEDIATION BLOWDOWN ON 12-8-15 STARTED WITH ZERO PSI AND BLEW DOWN TO ZERO. |
| 400836046 | Form 17 | 4/20/2015 | 5/6/2015 | PLUNGER LIFT | 229 | GAS | -- | 121 | WATER H20 | 866 | 866 | No | -- | -- | SURFACE CASING PRODUCED 65 GALLONS OF WATER DURING TEST. MONITORED THE SURFACE CASING AN EXTRA 30 MINUTES, PRESSURE ENDED AT 94 PSI. SHUT THE SURFACE CASING IN FOR 15 MINUTES, PRESSURE BUILT BACK UP TO 154 PSI. |
| 400766368 | Form 17 | 11/17/2014 | 1/7/2015 | PLUNGER LIFT | 201 | GAS | -- | 121 | WATER H20 | 573 | 581 | No | -- | -- | SC PRODUCED 25 GALLONS OF WATER AND STOPPED TEST. SI SC FOR 15 MINS, ENDED WITH 165 PSI |
| 400317526 | Form 17 | 8/8/2012 | 8/17/2012 | PLUNGER LIFT | 100 | GAS | -- | <1 | GAS | 440 | 456 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |