Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26903
Well Classification: GW Status: PA - 12/13/2018
Well Name/No:TALLGRASS #16-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/13/2018
FacilityID:296783LocationID:335564
Municipality/County:ERIE / WELD #123Location:SESE 17 1N68W 6
Field:WATTENBERG - #90750Elevation:5128 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1016FSL  1274 FELLat/Long: 40.046640 / -105.022750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.046646 / -105.022756Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/13/2018             Measured TD: 8120 ft.    Vertical TD: 8034 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/13/2018
Wellbore PermitDIRECTIONAL
Permit #:20090576 Expiration Date:3/10/2010
Proposed Top PZ Location:Sec:17 Twp: 1N 68W Footage: 553 FSL  521 FEL
Bottom Hole Location:Sec:17 Twp: 1N 68W Footage: 553 FSL  521 FEL
Proposed Depth/Form:8153 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S17S2

Wellbore Completed
Completion Date:N/A
Spud Date:5/5/2009Spud Date Is:ACTUAL
Measured TD:8120 ft.Measured PB depth:8072 ft.
True Vertical TD:8034 ft.True Vertical PB depth:7986 ft.
Top PZ Location:Sec:17 Twp: 1N 68WFootage: 553 FSL  521 FEL
Bottom Hole Location:Sec:17 Twp: 1N 68WFootage: 553 FSL  521 FEL
Log Types:CDL-CNL-DIL-GR-ML, CBL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 971 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 1620, Top: 0 ft., Bottom: 971 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8108 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 3200 ft., Bottom: 8108 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1173 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 750 ft., Bottom: 1192 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 757 ft., Depth: 1173 ft., Bottom: 1180 ft., Sacks: 70, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
PARKMAN4306 ft.4374 ft.NN
SUSSEX4720 ft.5060 ft.NN
SHANNON5302 ft.5365 ft.NN
NIOBRARA7568 ft.NN
FORT HAYS7941 ft.NN
CODELL7960 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/1/2009                 Interval Top: 7963 ft.    Interval Bottom: 7983 ft.

 Completed Information for Formation CODELL
1st Production Date:8/27/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2009
Treatment Summary:209,041 GAL FLUID; 150,200# 40/70 SAND; & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7963 ft.# Of Holes:60
Interval Bottom:7983 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/13/2018                Interval Top: 7575 ft.    Interval Bottom: 7983 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/27/2009Choke Size:0.281 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/9/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1124
CALC_BBLS_H2O 0
CALC_BBLS_OIL 15
CALC_GOR 1670
CALC_MCF_GAS 25
CASING_PRESS 150
GRAVITY_OIL 50
Perforation Data:
Interval Top:7575 ft.# Of Holes:126
Interval Bottom:7983 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/1/2009                 Interval Top: 7575 ft.    Interval Bottom: 7840 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/27/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/22/2009
Treatment Summary:1,000 GAL ACID; 242,425 GAL FLUID; 200,200# 40/70 SAND; & 4,000# 2040 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7575 ft.# Of Holes:66
Interval Bottom:7840 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/13/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No