| Click for Specifics | Full | 3/31/2025 | 7/21/2025 | | 1 | Whisper | None | 0 | No Flow | 96 | 95 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/14/2024 | 6/18/2024 | | 1 | Whisper | None | -- | No Flow | 95 | 95 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/1/2023 | 4/17/2023 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 0 | 0 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/24/2022 | 4/18/2022 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 128 | 128 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 4/7/2021 | 5/17/2021 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 129 | 129 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 2/19/2020 | 6/8/2020 | | 1 | Whisper (Very Low Flow) | | 1 | Whisper (Very Low Flow) | 510 | 513 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| Click for Specifics | Full | 3/1/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 400 | 400 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 400829016 | Form 17 | 4/15/2015 | 4/22/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 389 | 397 | No | -- | -- | POST REMEDIATION: AFTER 15 MINUTE SHUT-IN, SURFACE CASING STAYED AT 0 PSI. POST REMEDIATION TEST ON 4-9-2015, SURFACE CASING WAS AT A WHISPER OF GAS AND BLEW-DOWN TO 0 PSI. |
| 400379933 | Form 17 | 1/31/2013 | 2/11/2013 | PLUNGER LIFT | 91 | GAS | -- | 12 | GAS | 483 | 489 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |