Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-25832
Well Classification: OW Status: SI - 12/1/2020
Well Name/No:WARDELL #37-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2020
FacilityID:295877LocationID:336494
County:WELD #123Location:SESW 29 3N65W 6
Field:WATTENBERG - #90750Elevation:4877 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FSL  2154 FWLLat/Long: 40.190440 / -104.689020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.190439 / -104.689028Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2020             Measured TD: 7615 ft.    Vertical TD: 7382 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20081455 Expiration Date:5/4/2009
Proposed Top PZ Location:Sec:29 Twp: 3N 65W Footage: 111 FSL  1575 FEL
Bottom Hole Location:Sec:29 Twp: 3N 65W Footage: 111 FSL  1575 FEL
Proposed Depth/Form:7655 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:5/28/2008
Spud Date:5/24/2008Spud Date Is:ACTUAL
Measured TD:7615 ft.Measured PB depth:7582 ft.
True Vertical TD:7382 ft.True Vertical PB depth:7349 ft.
Top PZ Location:Sec:29 Twp: 3N 65WFootage: 111 FSL  1575 FEL
Bottom Hole Location:Sec:29 Twp: 3N 65WFootage: 115 FSL  1567 FEL
Log Types:CBL, CDL/CNL/ML, DIL/GL/GR
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 772 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 772 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7609 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 3270 ft., Bottom: 7609 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 763 ft., Depth: 1600 ft., Bottom: 1620 ft., Sacks: 220, Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
PARKMAN4022 ft.4065 ft.NN
SUSSEX4576 ft.4750 ft.NN
NIOBRARA7178 ft.NN
FORT HAYS7431 ft.NN
CODELL7455 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/17/2008                Interval Top: 7454 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation CODELL
1st Production Date:9/22/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2008
Treatment Summary:169,130 GALS FLUID; 115,260# 40/70 SAND & 4,000# 20/40 RC SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7454 ft.# Of Holes:64
Interval Bottom:7470 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 12/1/2020                 Interval Top: 7178 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/22/2008Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/28/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1230
CALC_BBLS_H2O 0
CALC_BBLS_OIL 49
CALC_GOR 5062
CALC_MCF_GAS 248
CASING_PRESS 1160
GRAVITY_OIL 51
Perforation Data:
Interval Top:7178 ft.# Of Holes:110
Interval Bottom:7470 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/17/2008                Interval Top: 7178 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/22/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2008
Treatment Summary:1,000 GALS ACID & 175,638 GALS FLUID & 250,160# 30/50 SAND & 4000# 20/40 R/C SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7178 ft.# Of Holes:66
Interval Bottom:7322 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
11/30/2020
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No