WELL05-123-25189CARMA
23-35
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
9/7/2021
WATTENBERG
90750
FIRESTONE/WELD  123
SWSW 35 3N68W 6
336155
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 554 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull5/18/20216/14/2021Plunger Lift37ContinuousNone--No Flow00NoNoNo Tubing Shut in. Tubing and Casing dead. Surface Casing produced no liquid.
402537522Form 1710/20/202011/20/2020 48CONTINUOUS GAS1 WHISPER 11No----Tubing Shut in. Surface Casing produced no liquid.
402257901Form 1712/9/201912/9/2019PLUNGER LIFT305GAS --1 WHISPER 7975Yes----SURFACE CASING PRODUCED NO FLUIDS. TUBING SHUT IN.
402162170Form 178/26/20198/30/2019PLUNGER LIFT305GAS --0 WHISPER 8282No----Surface casing produced no fluids. 15 minute shut in results in whisper. 30 minute blow down results in whisper.
402087200Form 176/18/20196/25/2019PLUNGER LIFT300GAS --1 WHISPER 8484No----Surface casing produced no fluids. 15 minute shut in resulted in 4 psi. 30 minute blow down resulted in whisper.
401765693Form 179/13/20189/17/2018 288GAS --1 WHISPER 109109YesYes--Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with 4 PSI. Well and master shut in.
400835421Form 174/15/20155/5/2015PLUNGER LIFT174GAS --1 GAS 12701272No----POST REMEDIATION TEST. INITIAL POST REMEDIATION BLOW-DOWN ON 4-9-2015, STARTED WITH 254 PSI, AND BLEW-DOWN TO A WHISPER. SURFACE CASING DID NOT PRODUCE ANY FLUID. 30 MINUTE BLOW-DOWN, WHISPER. 15 MINUTE BLUID-UP, 3. TEMP. SHUT-IN FOR HZ PREP, OPEN TO SALES AND SHUT-IN UPON ARRIVAL.
400991748Form 178/7/20142/18/2016PLUNGER LIFT158GAS -->23 GAS ----No----CASING INACCESSIBLE---SC did not produce any fluid. LOTO on ground valve, casing baylons and Demco. Blew down for an additional 30 min. ended with 12 psi. Followed up with a 15 min. build up finished with 58 psi.
400364447Form 1711/7/20121/3/2013PLUNGER LIFT51GAS --<1 CONTINUOUS 375391No----Surface casing produced 20 gallons of condensate during the form 17 test.