402043239 | Form 17 | 4/30/2019 | 5/14/2019 | PLUNGER LIFT | 23 | GAS | -- | 1 | WATER H20 | 583 | 585 | Yes | -- | -- | Surface casing produced water. Well shut in for 15min ended with psi. Surface casing blown down an extra 30min ended with a
whisper. |
400835437 | Form 17 | 4/17/2015 | 5/5/2015 | PLUNGER LIFT | 20 | GAS | -- | 0 | DOWN TO 0 | 2059 | 2059 | No | -- | -- | POST REMEDIATION TEST. INITIAL POST REMEDIATION BLOW-DOWN ON 4-9-2015 STARTED WITH 18 PSI, BLEW-DOWN TO 0 PSI. SURFACE CASING DID NOT PRODUCE ANY FLUID. 15 MINUTE BUILD-UP, WHISPER. OPEN TO SALES, TEMP. SHUT-IN FOR HZ PREP, AND TORN APART UPON ARRIVAL. |
400803161 | Form 17 | 2/13/2015 | 3/4/2015 | PLUNGER LIFT | 26 | GAS | -- | 0 | DOWN TO 0 | 1618 | 1618 | No | -- | -- | SURFACE CASING DID NOT PRODUCE ANY FLUID. WELL WAS TEMPORARILY SHUT-IN FOR HZ PREP., AND TORN APART UPON ARRIVAL. 15 MINUTE BUILD-UP, WHISPER. |
400290218 | Form 17 | 4/19/2012 | 5/29/2012 | PLUNGER LIFT | 348 | GAS | -- | 152 | GAS | 373 | 377 | No | -- | -- | No fluid was produced during 30 minute blow down |