|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/18/2019 Measured TD: 7657 ft. Vertical TD: 7381 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/18/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | 20071722 | Expiration Date: | 5/10/2008 | Proposed Top PZ Location: | Sec:35 Twp: 3N 68W | Footage: 44 FNL 1311 FWL | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 44 FNL 1311 FWL | Proposed Depth/Form: | 7677 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-82 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 8/2/2007 | Spud Date Is: | ACTUAL | Measured TD: | 7657 ft. | Measured PB depth: | 7625 ft. | True Vertical TD: | 7381 ft. | True Vertical PB depth: | 7349 ft. | Top PZ Location: | Sec:35 Twp: 3N 68W | Footage: 44 FNL 1311 FWL | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 41 N 1312 W | Log Types: | CBL/, DIL/GL,GR, CDL/CNL/ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 895 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 620, Top: 0 ft., Bottom: 895 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7641 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 495, Top: 3482 ft., Bottom: 7641 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1625 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 155, Top: 892 ft., Bottom: 1636 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3780 ft. | | N | N | SUSSEX | 4268 ft. | | N | N | SHANNON | 4814 ft. | | N | N | NIOBRARA | 7210 ft. | | N | N | FORT HAYS | 7462 ft. | | N | N | CODELL | 7484 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 5/25/2010 Interval Top: 7485 ft. Interval Bottom: 7505 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/14/2007 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/20/2010 | Treatment Summary: | NO ADDITIONAL TREATMENT. | Formation Treatment | Treatment Date: | 11/5/2007 | Treatment Summary: | 178,838 GAL FLUID & 4000 LBS 20/40 SAND & 112,598 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1267 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 73 | CALC_GOR | 960 | CALC_MCF_GAS | 70 | CASING_PRESS | 150 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7485 ft. | # Of Holes: | 80 | Interval Bottom: | 7505 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/18/2019 Interval Top: 7232 ft. Interval Bottom: 7505 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/28/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/20/2010 | Treatment Summary: | NBRR PERF 7232-7364 HOLES 72 SIZE 0.41. CODL PERF 7485-7505 HOLES 80 SIZE 0.38. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7451 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/24/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1306 | CALC_BBLS_OIL | 33 | CALC_GOR | 4515 | CALC_MCF_GAS | 149 | CASING_PRESS | 896 | GRAVITY_OIL | 52 | TUBING_PRESS | 505 |
| Perforation Data: | Interval Top: | 7232 ft. | # Of Holes: | 152 | Interval Bottom: | 7505 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/22/2010 Interval Top: 7232 ft. Interval Bottom: 7364 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/28/2010 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/20/2010 | Treatment Summary: | FRAC NBRR W/ 500 GAL 15% HCI AND 241928 GAL SW AND 200340# 40/70 SAND AND 4000# 20/40 SUPER LC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7232 ft. | # Of Holes: | 72 | Interval Bottom: | 7364 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 07/18/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|