| 402056373 | Form 17 | 5/21/2019 | 5/28/2019 | PLUNGER LIFT | 70 | GAS | -- | 8 | GAS | -- | -- | Yes | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with psi. Surface casing blown down an extra 30min ended with a whisper.
Casing was on vacuum. Tubing shut in. |
| 401265305 | Form 17 | 4/3/2017 | 4/24/2017 | | 10 | WHISPER | -- | 1 | WHISPER | 972 | 972 | No | -- | -- | SURFACE CSG PRODUCED NO FLUIDS. SHUT IN SURFACE CSG FOR 15 MIN.; ENDED WITH A WHISPER OF GAS.
|