|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/24/2020 Measured TD: 8075 ft. Vertical TD: 8075 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/24/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 20077216 | Expiration Date: | 2/11/2009 | | Proposed Depth/Form: | 8075 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 916 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 916 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8046 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 4107 ft., Bottom: 8046 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/16/2006 | | Spud Date: | 4/8/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8075 ft. | Measured PB depth: | 8031 ft. | | True Vertical TD: | 8075 ft. | True Vertical PB depth: | 8031 ft. | | Log Types: | CBL,DIGL,CDCN,ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 914 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 914 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8046 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 4107 ft., Bottom: 8046 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4131 ft. | | N | N | | SUSSEX | 4602 ft. | | N | N | | NIOBRARA | 7153 ft. | | N | N | | FORT HAYS | 7414 ft. | | N | N | | CODELL | 7437 ft. | | N | N | | J SAND | 7898 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/24/2020 Interval Top: 7914 ft. Interval Bottom: 7948 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/18/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/1/2008 | | Treatment Summary: | PERF JSND > 7914-7922 (2SPF) 7932-7948 ( SPF)165,731 GALS FLUID; 112,918# 40/70 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7914 ft. | # Of Holes: | 48 | | Interval Bottom: | 7948 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 2/24/2020 Interval Top: 7438 ft. Interval Bottom: 7450 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/8/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/4/2006 | | Treatment Summary: | 152,621 GALS FLUID & 117,120 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 33 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 33 | | CALC_GOR | 3310 | | CALC_MCF_GAS | 109 | | CASING_PRESS | 240 | | GRAVITY_OIL | 50 | | MCF_GAS | 109 | | TUBING_PRESS | 474 |
| | Perforation Data: | | Interval Top: | 7438 ft. | # Of Holes: | 48 | | Interval Bottom: | 7450 ft. | Hole Size: | 0.45 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/16/2008 Interval Top: 7438 ft. Interval Bottom: 7948 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 4/18/2008 | Choke Size: | 0.375 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/16/2006 | | Treatment Summary: | CODELL PERFS 05/01/2006 > 7438 - 7450 (4 SPF) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7875 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1324 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 5750 | | CALC_MCF_GAS | 46 | | CASING_PRESS | 600 | | GRAVITY_OIL | 49 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 7438 ft. | # Of Holes: | 96 | | Interval Bottom: | 7948 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/24/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|