401625979 | Form 17 | 4/12/2018 | 5/1/2018 | PLUNGER LIFT | 1 | WHISPER | -- | 0 | DOWN TO 0 | -- | -- | Yes | Yes | -- | Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with 0 PSI. Both tubing and casing were LOTO. |
400881583 | Form 17 | 8/4/2015 | 8/7/2015 | | 4 | GAS | -- | 0 | DOWN TO 0 | 149 | 149 | No | -- | -- | SC DID NOT PRODUCE AN FLUID. 15 MIN BUILD UP, DEAD. |
400478893 | Form 17 | 8/15/2013 | 9/10/2013 | PLUNGER LIFT | 4 | GAS | -- | 0 | DOWN TO 0 | 416 | 415 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS DURING THE FORM 17 TEST. |
400476842 | Form 17 | 7/1/2013 | 9/5/2013 | PLUNGER LIFT | 9 | GAS | -- | 0 | DOWN TO 0 | 393 | 393 | No | -- | -- | SURFACE CASING PRODUCED NO FLUID DURING FORM 17 TEST |