|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/24/2018 Measured TD: 8349 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/24/2018 | Wellbore Permit | DRIFTED | Permit #: | 20042460 | Expiration Date: | 11/4/2005 | Proposed Depth/Form: | 8349 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 |
| | |
Wellbore Completed | Completion Date: | 1/20/2005 | Spud Date: | 10/10/1991 | Spud Date Is: | ACTUAL | Measured TD: | 8349 ft. | Measured PB depth: | 8296 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL, SP, GR, CAL, CNL, LDT | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 849 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: 0 ft., Bottom: 849 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8344 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: 4000 ft., Bottom: 8344 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4509 ft. | | N | N | SHANNON | 5027 ft. | | N | N | NIOBRARA | 7376 ft. | | N | N | CODELL | 7682 ft. | | N | N | J SAND | 8114 ft. | | N | N | DAKOTA | 8290 ft. | | N | N |
Formation JSND Formation Classification: OG Status: AB - 5/25/2018 Interval Top: 8126 ft. Interval Bottom: 8152 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/28/1992 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/30/2009 | Treatment Summary: | REMOVED SAND PLUG THAT WAS SET ON 12/12/2004 @ 8303'. | Formation Treatment | Treatment Date: | 1/20/2005 | Treatment Summary: | ORIGINAL COMPLETION: FRAC DOWN CASING. PAD 10,500 GALS W/ 35# GEL & 10,500# 100 MESH SAND. PUMP 21,000 GALS 35# GEL & 21,000# 100 MESH SAND. PUMP 90,275 GALS W/ 30# GEL & 437,200# 20-40 SAND. FLUSH W/ 186 BBLS. ATP 2400 PSI, AIR 45 BPM. 1/05: BP SET @ 7793' FOR RECOMPLETION OF NB-CD. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 1 | CALC_BBLS_H2O | 20 | CALC_BBLS_OIL | 1 | CALC_GOR | 414000 | CALC_MCF_GAS | 414 | CASING_PRESS | 598 | MCF_GAS | 414 | TUBING_PRESS | 421 |
| Perforation Data: | Interval Top: | 8126 ft. | # Of Holes: | 208 | Interval Bottom: | 8152 ft. | Hole Size: | 0.5 in. |
|
Formation JNBCD Formation Classification: OG Status: CM - 5/21/2011 Interval Top: 7374 ft. Interval Bottom: 8152 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/11/2009 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/30/2009 | Treatment Summary: | JSND COMMINGLE |
| Tubing Size: | 22.375 in. | Tubing Setting Depth: | 8112 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/21/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1314 | CALC_BBLS_OIL | 2 | CALC_GOR | 15500 | CALC_MCF_GAS | 31 | CASING_PRESS | 287 | GRAVITY_OIL | 50 | MCF_GAS | 31 | TUBING_PRESS | 257 |
| Perforation Data: | Interval Top: | 7374 ft. | # Of Holes: | 242 | Interval Bottom: | 8152 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/25/2018 Interval Top: 7374 ft. Interval Bottom: 7702 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/20/2005 | Choke Size: | 0.406 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/20/2005 | Treatment Summary: | 500 GAL FLUID; 92,680 GAL FLUID; 138,240 LBS 20/40 SAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7659 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/20/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 16 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 16 | CALC_GOR | 6438 | CALC_MCF_GAS | 103 | CASING_PRESS | 444 | MCF_GAS | 103 | TUBING_PRESS | 302 |
| Perforation Data: | Interval Top: | 7374 ft. | # Of Holes: | 54 | Interval Bottom: | 7702 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/25/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|