| 404380356 | Form 17 | 9/17/2025 | 10/6/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 845 | 845 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/28/2025 | 2/3/2025 | | 0 | | -- | 0 | | 814 | 814 | No | No | No | |
| Click for Specifics | Full | 1/22/2024 | 1/29/2024 | Shut In | 0 | Continuous | -- | 0 | No Flow | 750 | 750 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/23/2023 | 4/10/2023 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/6/2022 | 4/18/2022 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 10/3/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 780 | 780 | No | None | None | |
| Click for Specifics | Light | 10/9/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 770 | 770 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 484 | 484 | No | No | No | |
| 400433278 | Form 17 | 5/21/2013 | 6/13/2013 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 529 | 530 | No | -- | -- | Surface casing produced no fluids during form 17 test. |