Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-13736
Well Classification: GW Status: PA - 10/14/2025
Well Name/No:HSR-STROH #11-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:61354
Facility Status:PAStatus Date10/14/2025
FacilityID:245941LocationID:326834
Municipality/County:MILLIKEN / WELD #123Location:NESW 35 5N67W 6
Field:WATTENBERG - #90750Elevation:4888 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  1980 FWLLat/Long: 40.354344 / -104.862764Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.354261 / -104.862553Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/14/2025             Measured TD: 7520 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/14/2025
Wellbore PermitDRIFTED
Permit #:940029 Expiration Date:5/13/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2SW

Wellbore Completed
Completion Date:2/10/1994
Measured TD:7520 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 468 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 468 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7515 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 6389 ft., Bottom: 7515 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5356 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 4135 ft., Bottom: 5356 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7042 ft.
FORT HAYS7349 ft.
CODELL7369 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/10/2025                Interval Top: 7374 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation CODELL
1st Production Date:2/10/1994Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7374 ft.# Of Holes:36
Interval Bottom:7382 ft.Hole Size:0.31 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/14/2025                Interval Top: 7052 ft.    Interval Bottom: 7382 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/10/1994Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7052 ft.# Of Holes:42
Interval Bottom:7382 ft.Hole Size:0.31 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/10/2025                Interval Top: 7052 ft.    Interval Bottom: 7174 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/10/1994Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7052 ft.# Of Holes:6
Interval Bottom:7174 ft.Hole Size:0.31 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/14/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
10/30/2025
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No