| Click for Specifics | Full | 9/22/2025 | 10/14/2025 | | 148 | N/A | -- | 0 | No Flow | 1117 | 1117 | No | No | No | 2" blowdown |
| 404154777 | Form 17 | 4/4/2025 | 4/7/2025 | FLOWING | 423 | CONTINUOUS | GAS | 0 | NO FLOW | 2040 | 2035 | No | -- | -- | TEP has initiated a diagnostic evaluation of this well due to the threshold pressure exceedance. The bradenhead test was performed through a two-inch valve. |
| Click for Specifics | Full | 10/23/2024 | 11/12/2024 | | 7 | N/A | -- | 0 | No Flow | 0 | 0 | No | No | No | 2" blowdown. No tubing |