403994807 | Form 17 | 10/23/2024 | 11/14/2024 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 405 | 445 | No | -- | -- | |
403628231 | Form 17 | 12/10/2023 | 12/18/2023 | | 0 | NO FLOW | -- | 0 | NO FLOW | 345 | 344 | No | -- | -- | |
403279118 | Form 17 | 1/2/2023 | 1/4/2023 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 359 | 355 | No | -- | -- | |
402923771 | Form 17 | 1/6/2022 | 1/12/2022 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 360 | 350 | No | -- | -- | |
402571724 | Form 17 | 1/6/2021 | 1/11/2021 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 352 | 357 | No | -- | -- | |
402281527 | Form 17 | 1/5/2020 | 1/9/2020 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 688 | 716 | No | -- | -- | |
401929938 | Form 17 | 2/4/2019 | 2/5/2019 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 1109 | 1120 | No | -- | -- | |
401854163 | Form 17 | 11/28/2018 | 11/29/2018 | SHUT-IN | 300 | NO FLOW | -- | 0 | NO FLOW | 30 | 30 | No | -- | -- | Bradenhead pressure was found to be 300 psig(most likely from thermal expansion). Pressure was bleed off and checked over 30 min and remained at zero. Have installed a pressure gauge and monitoring pressure. Tubing and packer are currently installed, tubing is shut in. |
401520397 | Form 17 | 11/16/2017 | 1/19/2018 | FLOWING | 0 | DOWN TO 0 | -- | 0 | NO FLOW | 1150 | 1150 | No | -- | -- | No flow observed during test. Test was performed during flowback operations. |
401419367 | Form 17 | 10/2/2017 | 10/3/2017 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 3041 | 3002 | No | -- | -- | Test was performed to satisfy the COA for the Form 2. Performed during a stop in fracturing operations. The slight loss of pressure in the production casing can be attributed to formation leakoff. The bradenhead had zero pressure and zero flow. |