Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07269
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:POWELL #5-64 15-16-1CHZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TRUE OIL LLC - 90450
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:89/6121-S
Facility Status:PRStatus Date8/1/2023
FacilityID:449923LocationID:449920
County:ARAPAHOE #005Location:NESE 15 5S64W 6
Field:WILDCAT - #99999Elevation:5938 ft.
Planned Location:2420FSL  440 FELLat/Long: 39.614915 / -104.530991Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.614914 / -104.530989Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2017
End Date: 10/13/2017
Reported: 1/22/2018
Days to report: 101
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 18230 ft.    Vertical TD: 7806 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2019
Proposed Top PZ Location:Sec:15 Twp: 5S 64W Footage: 980 FNL  600 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64W Footage: 1010 FNL  103 FWL
Proposed Depth/Form:18336 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-757 , Unit Acreage: 1280, Drill Unit: 5S64W:15 & 16-All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 40, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 872, Top: 0 ft., Bottom: 2100 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18237 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2751, Top: 0 ft., Bottom: 18237 ft.

Wellbore Completed
Completion Date:8/29/2017
Spud Date:8/14/2017Spud Date Is:ACTUAL
Measured TD:18230 ft.Measured PB depth:18228 ft.
True Vertical TD:7806 ft.True Vertical PB depth:7806 ft.
Top PZ Location:Sec:15 Twp: 5S 64WFootage: 980 FNL  600 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64WFootage: 1010 N  103 W
Log Types:CBL, Mud Log, MWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 216, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2189 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 0 ft., Bottom: 2190 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18228 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2625, Top: 1075 ft., Bottom: 18230 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5356 ft.NN
SHANNON5879 ft.NN
SHARON SPRINGS7759 ft.NN
NIOBRARA7884 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8487 ft.    Interval Bottom: 18083 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/6/2017Choke Size:30.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/30/2017Treatment End Date:10/13/2017
Treatment Summary:Frac 55 Stages with 57,664 gal total 28% HCL + 301,284 bbls total Base fluid + 1,095,267 lbs 100MESH + 3,875,680 lbs 40/70 sand +9,991,010 lbs 30/50 sand.
Total fluid used in treatment (bbls):302657Max pressure during treatment (psi):8724
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:55
Total acid used in treatment (bbls):1373Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):43703
Fresh water used in treatment (bbls):301284Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14961957Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7980 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2017Test Method:FLOW
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 649
BBLS_OIL 802
BTU_GAS 1431
CALC_BBLS_H2O 649
CALC_BBLS_OIL 802
CALC_GOR 761
CALC_MCF_GAS 610
CASING_PRESS 850
GRAVITY_OIL 40
MCF_GAS 610
TUBING_PRESS 510
Perforation Data:
Interval Top:8487 ft.# Of Holes:1650
Interval Bottom:18083 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)8031
Total Gas Produced (MCF)14056
GOR1750
GOR DeterminationBOE
Average BOE per Day28.591
Average MCFE per Day165.832

 Federal Financial Assurance  i 

 Tribal Well  i No