Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07269
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:POWELL #5-64 15-16-1CHZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TRUE OIL LLC - 90450
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:89/6121-S
Facility Status:PRStatus Date8/1/2023
FacilityID:449923LocationID:449920
County:ARAPAHOE #005Location:NESE 15 5S64W 6
Field:WILDCAT - #99999Elevation:5938 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2420FSL  440 FELLat/Long: 39.614915 / -104.530991Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.614914 / -104.530989Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2017
End Date: 10/13/2017
Reported: 1/22/2018
Days to report: 101
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 18230 ft.    Vertical TD: 7806 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2019
Proposed Top PZ Location:Sec:15 Twp: 5S 64W Footage: 980 FNL  600 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64W Footage: 1010 FNL  103 FWL
Proposed Depth/Form:18336 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-757 , Unit Acreage: 1280, Drill Unit: 5S64W:15 & 16-All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 40, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 872, Top: 0 ft., Bottom: 2100 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18237 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2751, Top: 0 ft., Bottom: 18237 ft.

Wellbore Completed
Completion Date:8/29/2017
Spud Date:8/14/2017Spud Date Is:ACTUAL
Measured TD:18230 ft.Measured PB depth:18228 ft.
True Vertical TD:7806 ft.True Vertical PB depth:7806 ft.
Top PZ Location:Sec:15 Twp: 5S 64WFootage: 980 FNL  600 FEL
Bottom Hole Location:Sec:16 Twp: 5S 64WFootage: 1010 FNL  103 FWL
Log Types:CBL, Mud Log, MWD, RES
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 216, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2189 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 0 ft., Bottom: 2190 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18228 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2625, Top: 1075 ft., Bottom: 18230 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5356 ft.NN
SHANNON5879 ft.NN
SHARON SPRINGS7759 ft.NN
NIOBRARA7884 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8487 ft.    Interval Bottom: 18083 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/6/2017Choke Size:30.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/30/2017Treatment End Date:10/13/2017
Treatment Summary:Frac 55 Stages with 57,664 gal total 28% HCL + 301,284 bbls total Base fluid + 1,095,267 lbs 100MESH + 3,875,680 lbs 40/70 sand +9,991,010 lbs 30/50 sand.
Total fluid used in treatment (bbls):302657Max pressure during treatment (psi):8724
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:55
Total acid used in treatment (bbls):1373Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):43703
Fresh water used in treatment (bbls):301284Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14961957Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7980 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/30/2017Test Method:FLOW
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 649
BBLS_OIL 802
BTU_GAS 1431
CALC_BBLS_H2O 649
CALC_BBLS_OIL 802
CALC_GOR 761
CALC_MCF_GAS 610
CASING_PRESS 850
GRAVITY_OIL 40
MCF_GAS 610
TUBING_PRESS 510
Perforation Data:
Interval Top:8487 ft.# Of Holes:1650
Interval Bottom:18083 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7224
Total Gas Produced (MCF)12094
GOR1674
GOR DeterminationBOE
Average BOE per Day25.508
Average MCFE per Day147.949

 Federal Financial Assurance  i 

 Tribal Well  i No