Click for Specifics | Full | 7/3/2024 | 7/9/2024 | | 0 | No Flow | -- | 0 | No Flow | 602 | 602 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 11/15/2023 | 11/22/2023 | Plunger Lift | 0 | No Flow | -- | 0 | No Flow | 629 | 627 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 10/20/2022 | 11/8/2022 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 452 | 453 | No | None | None | |
Click for Specifics | Light | 10/18/2021 | 10/25/2021 | Plunger Lift | 0 | | -- | 0 | | 496 | 496 | No | No | No | Test per NTO. BH dead. |
Click for Specifics | Light | 12/7/2020 | 12/14/2020 | Flowing | -3 | | -- | 0 | No Flow | 850 | 829 | No | No | No | Test per NTO. Vaccum for 1 minute at open then dead. |
402253234 | Form 17 | 12/2/2019 | 12/4/2019 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 154 | 154 | No | -- | -- | Test after DOFP/NTO. Test through 2" ball valve. BH dead. |
402182626 | Form 17 | 9/15/2019 | 9/19/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac |