Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10468
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Rio LC #12-369HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:465156LocationID:465146
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:263FNL  155 FWLLat/Long: 39.999619 / -104.939783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999618 / -104.939783Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/26/2019
End Date: 10/17/2019
Reported: 11/1/2019
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 18102 ft.    Vertical TD: 7521 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  2355 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 360 FSL  2390 FEL
Proposed Depth/Form:17858 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17858 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1753, Top: , Bottom: 17858 ft.

Wellbore Completed
Completion Date:8/22/2019
Spud Date:7/7/2019Spud Date Is:ACTUAL
Measured TD:18102 ft.Measured PB depth:18092 ft.
True Vertical TD:7521 ft.True Vertical PB depth:7521 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 559 FNL  2368 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 231 FSL  2387 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API# 001-09950)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1779 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1779 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18102 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2535, Top: 3666 ft., Bottom: 18102 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4576 ft.4698 ft.NN
SUSSEX5114 ft.5269 ft.NN
SHANNON5709 ft.5785 ft.NN
SHARON SPRINGS8066 ft.NN
NIOBRARA8093 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8556 ft.    Interval Bottom: 17803 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/26/2019Treatment End Date:10/17/2019
Treatment Summary:3,202 bbls 15% HCL Acid; 766,390# 100 Mesh Sand; 7,919,120# 20/40 Sand; 220,868 bbls Gelled Fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):224070Max pressure during treatment (psi):5288
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):3202Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):37974
Fresh water used in treatment (bbls):220868Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8685510Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 722
BBLS_OIL 530
BTU_GAS 1387
CALC_BBLS_H2O 722
CALC_BBLS_OIL 530
CALC_GOR 1862
CALC_MCF_GAS 987
CASING_PRESS 43
GRAVITY_OIL 45
MCF_GAS 987
TUBING_PRESS 1314
Perforation Data:
Interval Top:8556 ft.# Of Holes:1856
Interval Bottom:17803 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3922
Total Gas Produced (MCF)50212
GOR12802
GOR DeterminationBOE
Average BOE per Day34.237
Average MCFE per Day198.579

 Federal Financial Assurance  i 

 Tribal Well  i No