| Click for Specifics | Full | 11/6/2025 | 11/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 669 | 669 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404227510 | Form 17 | 5/20/2025 | 6/3/2025 | FLOWING | 7 | CONTINUOUS | GAS | 1 | WHISPER | 24 | 24 | No | -- | -- | Engineering Ad Hoc test. 7 PSI whisper gas blew down to 1 PSI in thirty minutes, whisper gas observed for entire test. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 2/14/2025 | 3/4/2025 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403895073 | Form 17 | 8/14/2024 | 8/20/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403675311 | Form 17 | 2/1/2024 | 2/2/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403495723 | Form 17 | 8/4/2023 | 8/14/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |