Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10464
Well Classification: OW Status: PR - 5/2/2025
Well Name/No:Rio #22C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/2/2025
FacilityID:465152LocationID:465146
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:399FNL  66 FWLLat/Long: 39.999246 / -104.940099Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999245 / -104.940099Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/8/2025
End Date: 3/15/2025
Reported: 5/1/2025
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 2022 ft.    Vertical TD: 2022 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  1565 FWL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 460 FSL  1565 FWL
Proposed Depth/Form:18964 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 &12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1703 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 708, Top: 0 ft., Bottom: 1703 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18964 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3480, Top: , Bottom: 18964 ft.

Wellbore Completed
Completion Date:3/17/2020
Spud Date:3/16/2020Spud Date Is:ACTUAL
Measured TD:2022 ft.Measured PB depth:1977 ft.
True Vertical TD:2022 ft.True Vertical PB depth:1977 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 777 FNL  1552 FWL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 460 FSL  1565 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2022 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 0 ft., Bottom: 2022 ft., Determination Method: VISU

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/11/2026                 Interval Top: 12760 ft.    Interval Bottom: 18708 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/2/2025Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/11/2026Treatment End Date:N/A
Treatment Summary:Ft. Hays perforated intervals: 12760-13115, 14338-14740, 18551-18708
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12760 ft.# Of Holes:0
Interval Bottom:18708 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 5/2/2025                  Interval Top: 9687 ft.    Interval Bottom: 18708 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:5/2/2025Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/8/2025Treatment End Date:3/15/2025
Treatment Summary:Codell-Fort Hays completed with 228 bbls 28% HCL, 185,815 bbls slurry, 8,988,322 lb 40/140.
Total fluid used in treatment (bbls):186043Max pressure during treatment (psi):8052
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):228Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):185815Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8988322Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8961 ft.
Tubing Packer Depth:8957 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 266
BBLS_OIL 242
BTU_GAS 1172
CALC_BBLS_H2O 266
CALC_BBLS_OIL 242
CALC_GOR 1719
CALC_MCF_GAS 416
CASING_PRESS 16
GRAVITY_OIL 42
MCF_GAS 416
TUBING_PRESS 1882
Perforation Data:
Interval Top:9687 ft.# Of Holes:800
Interval Bottom:18708 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/11/2026                 Interval Top: 9687 ft.    Interval Bottom: 18550 ft.

 Completed Information for Formation CODELL
1st Production Date:5/2/2025Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/11/2026Treatment End Date:N/A
Treatment Summary:Codell perforated intervals: 9687-12759, 13116-14337, 14741-18550
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9687 ft.# Of Holes:0
Interval Bottom:18550 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)88204
Total Gas Produced (MCF)416974
GOR4727
GOR DeterminationBOE
Average BOE per Day435.725
Average MCFE per Day2527.203

 Federal Financial Assurance  i 

 Tribal Well  i No