| Click for Specifics | Light | 5/4/2025 | 6/16/2025 | | 0 | | -- | 0 | | 565 | 565 | No | No | No | |
| Click for Specifics | Light | 7/15/2024 | 8/20/2024 | | 0 | | -- | 0 | | 415 | 415 | No | No | No | |
| Click for Specifics | Light | 5/2/2023 | 6/5/2023 | Flowing | 0 | | -- | 0 | | 412 | 412 | No | No | No | |
| Click for Specifics | Light | 5/2/2022 | 6/22/2022 | Plunger Lift | 0 | | -- | 0 | | 450 | 450 | No | No | No | |
| Click for Specifics | Full | 8/31/2021 | 9/20/2021 | | 0 | NO FLOW | -- | 0 | NO FLOW | 509 | 509 | No | NO | No |
Surface casing had no pressure or flow. |
| Click for Specifics | Full | 1/28/2020 | 2/10/2020 | | 0 | WHISPER | -- | 0 | NO FLOW | 267 | 267 | No | No | No | Surface casing, had no pressure, whispered for 30 seconds when opened. |
| 402047457 | Form 17 | 5/11/2019 | 5/17/2019 | FLOWING | 0 | WHISPER | -- | 0 | NO FLOW | 712 | 711 | No | -- | -- | Surface casing whispered for 5 seconds when opened, gas only. |
| 401909556 | Form 17 | 1/14/2019 | 1/17/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test.
Well is treed up for frac. No means of gauging production casing pressure.
|