Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10166
Well Classification: OW Status: PR - 9/1/2023
Well Name/No:Duck Club #12W-20-8C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2023
FacilityID:456119LocationID:456114
County:ADAMS #001Location:NWSW 12 1S66W 6
Field:WATTENBERG - #90750Elevation:5037 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2408FSL  686 FWLLat/Long: 39.978910 / -104.730960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978912 / -104.730958Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/23/2019
End Date: 2/3/2019
Reported: 3/19/2019
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2023             Measured TD: 17815 ft.    Vertical TD: 7650 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:12 Twp: 1S 66W Footage: 2060 FSL  2169 FWL
Bottom Hole Location:Sec:10 Twp: 1S 66W Footage: 1917 FSL  2178 FEL
Proposed Depth/Form:17855 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2422 , Unit Acreage: 1280, Drill Unit: Sec 10,11&12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17855 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2383, Top: 1500 ft., Bottom: 17855 ft.

Wellbore Completed
Completion Date:12/3/2018
Spud Date:11/5/2018Spud Date Is:ACTUAL
Measured TD:17815 ft.Measured PB depth:17808 ft.
True Vertical TD:7650 ft.True Vertical PB depth:7650 ft.
Top PZ Location:Sec:12 Twp: 1S 66WFootage: 2100 FSL  2147 FWL
Bottom Hole Location:Sec:10 Twp: 1S 66WFootage: 1920 FSL  2129 FEL
Log Types:CBL, Mud, MWD/LWD, (Resistivity on 001-10158).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1614 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 1614 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17813 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2809, Top: 180 ft., Bottom: 17815 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5038 ft.NN
SHARON SPRINGS7602 ft.NN
NIOBRARA7630 ft.NN
FORT HAYS8104 ft.NN
CODELL8246 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/12/2019                 Interval Top: 8694 ft.    Interval Bottom: 14305 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/29/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/23/2019Treatment End Date:2/3/2019
Treatment Summary:Perforated Intervals: 8694'-9017'; 11805'-12340'; 14031'-14305'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8694 ft.# Of Holes:141
Interval Bottom:14305 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/12/2019                 Interval Top: 8611 ft.    Interval Bottom: 8671 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/29/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/23/2019Treatment End Date:2/3/2019
Treatment Summary:Perforated Interval: 8611'-8671'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8611 ft.# Of Holes:18
Interval Bottom:8671 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/12/2019                 Interval Top: 8265 ft.    Interval Bottom: 17798 ft.

 Completed Information for Formation CODELL
1st Production Date:4/29/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/23/2019Treatment End Date:2/3/2019
Treatment Summary:Perforated Intervals: 8265'-8588'; 9040'-11779'; 12363'-14008'; 14306'-17798'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8265 ft.# Of Holes:970
Interval Bottom:17798 ft.Hole Size:0.4 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 9/1/2023                  Interval Top: 8265 ft.    Interval Bottom: 17798 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:4/29/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/23/2019Treatment End Date:2/3/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell with 48-stage plug-and-perf; 151756 total bbls fluid pumped: 136392 bbls gelled fluid, 15358 bbls fresh water, and 6 bbls 28% HCl acid; 9552080 total lbs proppant pumped: all 30/50 mesh.
Total fluid used in treatment (bbls):151756Max pressure during treatment (psi):8407
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14769
Fresh water used in treatment (bbls):15358Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9552080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8083 ft.
Tubing Packer Depth:8069 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/5/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 655
BBLS_OIL 780
BTU_GAS 1350
CALC_BBLS_H2O 655
CALC_BBLS_OIL 780
CALC_GOR 1186
CALC_MCF_GAS 925
CASING_PRESS 777
GRAVITY_OIL 41
MCF_GAS 925
TUBING_PRESS 1424
Perforation Data:
Interval Top:8265 ft.# Of Holes:1129
Interval Bottom:17798 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7882
Total Gas Produced (MCF)43406
GOR5506
GOR DeterminationBOE
Average BOE per Day42.245
Average MCFE per Day245.053

 Federal Financial Assurance  i 

 Tribal Well  i No