| 404326576 | Form 17 | 8/20/2025 | 8/22/2025 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 841 | 842 | No | -- | -- | |
| Click for Specifics | Light | 6/4/2024 | 6/10/2024 | | 0 | | -- | 0 | | 911 | 912 | No | No | No | |
| Click for Specifics | Light | 6/26/2023 | 7/3/2023 | Flowing | 2 | | -- | 0 | | 912 | 912 | No | No | No | |
| 403253189 | Form 17 | 12/1/2022 | 12/7/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2252 | 2252 | No | -- | -- | Post Drilling Bradenhead Test. Casing Pressure is residual from production casing pressure test. |