Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51749
Well Classification: OW Status: PR - 6/4/2023
Well Name/No:Ruby West #8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2023
FacilityID:482562LocationID:482392
County:WELD #123Location:NESW 7 7N65W 6
Field:WATTENBERG - #90750Elevation:4922 ft.
Planned Location:2482FSL  2426 FWLLat/Long: 40.589365 / -104.707115Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/3/2023
End Date: 1/24/2023
Reported: 4/17/2023
Days to report: 83
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/4/2023             Measured TD: 17926 ft.    Vertical TD: 7319 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/4/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/7/2025
Proposed Top PZ Location:Sec:12 Twp: 7N 65W Footage: 2131 FSL  470 FEL
Bottom Hole Location:Sec:11 Twp: 7N 65W Footage: 2131 FSL  470 FWL
Proposed Depth/Form:17888 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 12, 11
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17888 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2458, Top: 2500 ft., Bottom: 17888 ft.

Wellbore Completed
Completion Date:9/14/2022
Spud Date:8/11/2022Spud Date Is:ACTUAL
Measured TD:17926 ft.Measured PB depth:17915 ft.
True Vertical TD:7319 ft.True Vertical PB depth:7319 ft.
Top PZ Location:Sec:12 Twp: 7N 65WFootage: 2139 FSL  658 FEL
Bottom Hole Location:Sec:11 Twp: 7N 65WFootage: 2127 FSL  474 FWL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-51747
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1563 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1563 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17915 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2850, Top: 200 ft., Bottom: 17915 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4158 ft.NN
SUSSEX4730 ft.NN
SHANNON5532 ft.NN
SHARON SPRINGS7594 ft.NN
NIOBRARA7615 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/4/2023                  Interval Top: 8386 ft.    Interval Bottom: 17803 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/4/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/3/2023Treatment End Date:1/24/2023
Treatment Summary:539,750 bbls total slickwater; 17,500,514 # sand total (200/mesh 1961165 100/mesh 40/70 15539349 30/50); 1997 gals 15% HCL. Method used to determine flowback volume: individual separator meters
Total fluid used in treatment (bbls):539750Max pressure during treatment (psi):8949
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):1.04
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6692
Fresh water used in treatment (bbls):539703Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17500514Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7485 ft.
Tubing Packer Depth:7485 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1290
BBLS_OIL 16
BTU_GAS 1384
CALC_BBLS_H2O 1290
CALC_BBLS_OIL 16
CALC_GOR 3375
CALC_MCF_GAS 54
GRAVITY_OIL 42
MCF_GAS 54
TUBING_PRESS 1623
Perforation Data:
Interval Top:8386 ft.# Of Holes:1242
Interval Bottom:17803 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)15949
Total Gas Produced (MCF)42313
GOR2653
GOR DeterminationBOE
Average BOE per Day63.549
Average MCFE per Day368.554

 Federal Financial Assurance  i 

 Tribal Well  i No