| 404326523 | Form 17 | 8/20/2025 | 8/22/2025 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 1032 | 1047 | No | -- | -- | |
| Click for Specifics | Light | 6/4/2024 | 6/10/2024 | | 0 | | -- | 0 | | 1047 | 1047 | No | No | No | |
| Click for Specifics | Light | 6/26/2023 | 7/3/2023 | Flowing | 2 | | -- | 0 | | 930 | 930 | No | No | No | |
| 403246121 | Form 17 | 11/30/2022 | 12/1/2022 | SHUT-IN | 7 | WHISPER | -- | 0 | NO FLOW | 2475 | 2474 | No | -- | -- | Post Drilling bradenhead test. Casing pressure is residual from pre-completion production casing pressure test. |