|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/28/2023 Measured TD: 17935 ft. Vertical TD: 7145 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/28/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/7/2025 | Proposed Top PZ Location: | Sec:7 Twp: 7N 65W | Footage: 1820 FNL 470 FWL | Bottom Hole Location: | Sec:8 Twp: 7N 65W | Footage: 1820 FNL 470 FEL | Proposed Depth/Form: | 18123 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 7, 8 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18123 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2497, Top: 2500 ft., Bottom: 18123 ft. |
| | |
Wellbore Completed | Completion Date: | 9/2/2022 | Spud Date: | 7/30/2022 | Spud Date Is: | ACTUAL | Measured TD: | 17935 ft. | Measured PB depth: | 17920 ft. | True Vertical TD: | 7145 ft. | True Vertical PB depth: | 7145 ft. | Top PZ Location: | Sec:7 Twp: 7N 65W | Footage: 1825 FNL 512 FWL | Bottom Hole Location: | Sec:8 Twp: 7N 65W | Footage: 1808 FNL 473 FEL | Log Types: | MWD/LWD, CBL, MUD, DIL in API 05-123-51747 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1552 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1552 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17920 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2730, Top: 350 ft., Bottom: 17920 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4259 ft. | | N | N | SUSSEX | 4841 ft. | | N | N | SHANNON | 5660 ft. | | N | N | SHARON SPRINGS | 7715 ft. | | N | N | NIOBRARA | 7736 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 5/28/2023 Interval Top: 8210 ft. Interval Bottom: 17826 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/28/2023 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 2/6/2023 | Treatment End Date: | 3/2/2023 | Treatment Summary: | 565318 bbls total slickwater; 18678611 # sand total( 200/mesh 2075790 100/mesh 40/70 16602821 30/50); 3992 gals 15% HCL. Method used to determine flowback volume: individual separator meters.
| Total fluid used in treatment (bbls): | 565318 | Max pressure during treatment (psi): | 9270 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 49 | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 4087 | Fresh water used in treatment (bbls): | 565223 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 18678611 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7828 ft. | Tubing Packer Depth: | 7828 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/28/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1399 | BBLS_OIL | 15 | BTU_GAS | 1384 | CALC_BBLS_H2O | 1399 | CALC_BBLS_OIL | 15 | CALC_GOR | 1467 | CALC_MCF_GAS | 22 | GRAVITY_OIL | 42 | MCF_GAS | 22 | TUBING_PRESS | 1905 |
| Perforation Data: | Interval Top: | 8210 ft. | # Of Holes: | 1323 | Interval Bottom: | 17826 ft. | Hole Size: | 0.433 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 18655 |
Total Gas Produced (MCF) | 154262 |
GOR | 8269 |
GOR Determination | BOE |
Average BOE per Day | 123.681 |
Average MCFE per Day | 717.343 |
Federal Financial Assurance | i | |
|
|