| 404400470 | Form 17 | 10/14/2025 | 10/22/2025 | PLUNGER LIFT | 18 | DOWN TO 0 | GAS | 0 | NO FLOW | 510 | 509 | No | -- | -- | Remediation follow up test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404043743 | Form 17 | 12/11/2024 | 12/31/2024 | PLUNGER LIFT | 14 | DOWN TO 0 | GAS | 0 | NO FLOW | 654 | 655 | No | -- | -- | Remediation follow up test. 14 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 10/15/2024 | 10/22/2024 | | 15 | Continuous | -- | 0 | No Flow | 722 | 721 | No | No | No | Annual Test. 15 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/1/2023 | 11/13/2023 | Flowing | 10 | Down to Zero | -- | 0 | No Flow | 1044 | 1042 | No | No | No | Annual Test. 10 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403256688 | Form 17 | 12/8/2022 | 12/12/2022 | FLOWING | 53 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 2290 | 2290 | Yes | -- | -- | 30 days of first sales - high pressure follow-up. 53 PSI water on open, produced 1 quart and died for several minutes. Water drips started again shortly after 5 minute mark. Collected 1000mL water sample. Water drip for duration of test, produced ~ 1/2 gallon of water total. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403076351 | Form 17 | 6/10/2022 | 6/13/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |