|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/13/2022 Measured TD: 18395 ft. Vertical TD: 7357 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/13/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/30/2022 | | Proposed Top PZ Location: | Sec:7 Twp: 5N 66W | Footage: 311 FSL 240 FWL | | Bottom Hole Location: | Sec:8 Twp: 5N 66W | Footage: 323 FSL 464 FEL | | Proposed Depth/Form: | 18451 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 920, Top: 0 ft., Bottom: 1600 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18451 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2035, Top: , Bottom: 18451 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/3/2022 | | Spud Date: | 1/9/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 18395 ft. | Measured PB depth: | 18368 ft. | | True Vertical TD: | 7357 ft. | True Vertical PB depth: | 7357 ft. | | Top PZ Location: | Sec:7 Twp: 5N 66W | Footage: 311 FSL 240 FWL | | Bottom Hole Location: | Sec:8 Twp: 5N 66W | Footage: 323 FSL 464 FEL | | Log Types: | CBL, MWD (DIL in 123-50256 and 123-50255) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1699 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 1699 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18382 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2898, Top: 1772 ft., Bottom: 18382 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3934 ft. | | | | | SUSSEX | 4530 ft. | | | | | SHANNON | 5172 ft. | | | | | SHARON SPRINGS | 7566 ft. | | | | | NIOBRARA | 7610 ft. | | | | | FORT HAYS | 8087 ft. | | | | | CODELL | 8150 ft. | | | | | CARLILE | 10546 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 5/10/2023 Interval Top: 10546 ft. Interval Bottom: 11464 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/10/2023 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 10,546'-11,464' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 10546 ft. | # Of Holes: | 2004 | | Interval Bottom: | 11464 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 5/10/2023 Interval Top: 8617 ft. Interval Bottom: 8891 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/10/2023 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8,617'-8,891' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8617 ft. | # Of Holes: | 2004 | | Interval Bottom: | 8891 ft. | Hole Size: | 0.42 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 11/13/2022 Interval Top: 8481 ft. Interval Bottom: 18382 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 11/2/2022 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 9/24/2022 | Treatment End Date: | 10/7/2022 | | Treatment Summary: | 56 Stage Plug and Perf
Total Fluid: 182,008 bbls
Gel Fluid: 100,657 bbls
Slickwater Fluid:80,613 bbls
15% HCl Acid: 738 bbls
Total Proppant: 11,767,270 lbs
Silica Proppant: 11,767,270 lbs
Method for determining flowback: Measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 182008 | Max pressure during treatment (psi): | 4467 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 56 | | Total acid used in treatment (bbls): | 738 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 11718 | | Fresh water used in treatment (bbls): | 181270 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 11767270 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8035 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/13/2022 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 269 | | BBLS_OIL | 300 | | BTU_GAS | 1340 | | CALC_BBLS_H2O | 269 | | CALC_BBLS_OIL | 300 | | CALC_GOR | 3043 | | CALC_MCF_GAS | 913 | | CASING_PRESS | 2607 | | GRAVITY_OIL | 60 | | MCF_GAS | 913 | | TUBING_PRESS | 1578 |
| | Perforation Data: | | Interval Top: | 8481 ft. | # Of Holes: | 2004 | | Interval Bottom: | 18382 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/10/2023 Interval Top: 8481 ft. Interval Bottom: 18382 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/10/2023 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8,481'-8,617', 8,891'-10,546', 11,464'-18,382' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8481 ft. | # Of Holes: | 2004 | | Interval Bottom: | 18382 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 16490 |
| Total Gas Produced (MCF) | 329640 |
| GOR | 19990 |
| GOR Determination | MCFE |
| Average BOE per Day | 201.070 |
| Average MCFE per Day | 1166.185 |
| Federal Financial Assurance | i | |
|
|