| 404408193 | Form 17 | 10/15/2025 | 10/27/2025 | PLUNGER LIFT | 109 | DOWN TO 0 | WATER H20 | 2 | CONTINUOUS | 565 | 582 | No | -- | -- | Remediation follow up test. 109 PSI gas and water, blew down to 2 PSI in thirty minutes, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403960748 | Form 17 | 10/14/2024 | 10/17/2024 | PLUNGER LIFT | 41 | CONTINUOUS | GAS | 0 | NO FLOW | 695 | 696 | No | -- | -- | Remediation follow up test. 41 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403802432 | Form 17 | 5/17/2024 | 5/23/2024 | | 74 | CONTINUOUS | WATER H20 | 2 | CONTINUOUS | 742 | 740 | No | -- | -- | Engineering Ad Hoc test. 74 PSI continuous water blew down to 2 PSI in thirty minutes. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 12/13/2023 | 12/18/2023 | Flowing | 0 | Down to Zero | -- | 0 | Down to Zero | 864 | 883 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403256644 | Form 17 | 12/6/2022 | 12/12/2022 | FLOWING | 75 | DOWN TO 0 | GAS | 0 | NO FLOW | 1669 | 1664 | Yes | -- | -- | 30 days of first sales - high pressure follow-up. 75 PSI gas flow blew down to 0 PSI within 5 minutes, no flow or pressure for remainder of the test. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403076362 | Form 17 | 6/10/2022 | 6/13/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |