Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51453
Well Classification: OW Status: PR - 11/24/2022
Well Name/No:Bost Farm #40C-8-L2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/24/2022
FacilityID:478981LocationID:456832
Municipality/County:GREELEY / WELD #123Location:Lot2 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4872 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2506FNL  1256 FWLLat/Long: 40.414642 / -104.827857Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.414650 / -104.827870Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/8/2022
End Date: 10/17/2022
Reported: 11/8/2022
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/24/2022             Measured TD: 17853 ft.    Vertical TD: 7371 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/24/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/30/2022
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 2377 FSL  201 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 2351 FSL  465 FEL
Proposed Depth/Form:17868 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2705 , Unit Acreage: 2564, Drill Unit: Sec 7,8,11,12
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17868 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: , Bottom: 17868 ft.

Wellbore Completed
Completion Date:5/21/2022
Spud Date:1/3/2022Spud Date Is:ACTUAL
Measured TD:17853 ft.Measured PB depth:17824 ft.
True Vertical TD:7371 ft.True Vertical PB depth:7372 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 2377 FSL  201 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 2351 FSL  465 FEL
Log Types:CBL, MWD (DIL in 123-50256 and 123-50255)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1656 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 499, Top: 0 ft., Bottom: 1656 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17840 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2816, Top: 480 ft., Bottom: 17840 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3821 ft.
SUSSEX4338 ft.
SHANNON4946 ft.
SHARON SPRINGS7256 ft.
NIOBRARA7297 ft.
FORT HAYS7761 ft.
CODELL7832 ft.
CARLILE8758 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/23/2025                 Interval Top: 8758 ft.    Interval Bottom: 9018 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2025Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,758'-9,018'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8758 ft.# Of Holes:984
Interval Bottom:9018 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/23/2025                 Interval Top: 7996 ft.    Interval Bottom: 17840 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2025Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,996'-8,758', 9,018'-17,840'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7996 ft.# Of Holes:984
Interval Bottom:17840 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 11/24/2022                Interval Top: 7966 ft.    Interval Bottom: 17840 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:11/11/2022Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:10/8/2022Treatment End Date:10/17/2022
Treatment Summary:28 Stage Plug and Perf Total Fluid: 153,482 bbls Gel Fluid: 80,492 bbls Slickwater Fluid: 72,657 bbls 15% HCl Acid: 333 bbls Total Proppant: 5,980,130 lbs Silica Proppant: 5,980,130 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):153482Max pressure during treatment (psi):4774
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):333Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8304
Fresh water used in treatment (bbls):153149Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5980130Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7578 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/24/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 77
BBLS_OIL 164
BTU_GAS 1335
CALC_BBLS_H2O 77
CALC_BBLS_OIL 164
CALC_GOR 4244
CALC_MCF_GAS 696
CASING_PRESS 1825
GRAVITY_OIL 55
MCF_GAS 696
TUBING_PRESS 1045
Perforation Data:
Interval Top:7966 ft.# Of Holes:984
Interval Bottom:17840 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/23/2025                 Interval Top: 7966 ft.    Interval Bottom: 7996 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2025Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,966'-7,996'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7966 ft.# Of Holes:984
Interval Bottom:7996 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4060
Total Gas Produced (MCF)69517
GOR17122
GOR DeterminationMCFE
Average BOE per Day43.867
Average MCFE per Day254.410

 Federal Financial Assurance  i 

 Tribal Well  i No