| Click for Specifics | Full | 10/9/2025 | 10/22/2025 | | 1 | Continuous | -- | 0 | No Flow | 332 | 332 | No | No | No | Annual Test. 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 10/19/2024 | 10/22/2024 | | 0 | | -- | 0 | | 346 | 346 | No | No | No | |
| Click for Specifics | Full | 12/20/2023 | 12/26/2023 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 527 | 527 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/28/2022 | 2/21/2022 | | 1 | Down to Zero | -- | 0 | Down to Zero | 680 | 679 | No | No | No | |
| Click for Specifics | Full | 8/11/2021 | 11/1/2021 | | 12 | Down to Zero | -- | 0 | No Flow | 762 | 772 | No | None | None | |
| 402930435 | Form 17 | 10/6/2020 | 1/19/2022 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 1482 | 1482 | No | -- | -- | Post Production test within 60 days of first sales, 0 PSI no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up) |
| Click for Specifics | Light | 4/16/2020 | 12/14/2020 | | 0 | | -- | 0 | | 923 | 923 | No | No | No | |
| 402238073 | Form 17 | 11/8/2019 | 11/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, vapor or gas. |