Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50254
Well Classification: OW Status: PR - 6/13/2020
Well Name/No:Bost Farm #13N-11B-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/13/2020
FacilityID:465694LocationID:456832
Municipality/County:GREELEY / WELD #123Location:NWSW 7 5N66W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4873 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2666FSL  1214 FWLLat/Long: 40.414148 / -104.828006Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.414149 / -104.828005Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/17/2020
End Date: 5/3/2020
Reported: 1/25/2022
Originally Reported: 5/12/2020
Days to report: 632
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/13/2020             Measured TD: 17990 ft.    Vertical TD: 6903 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/13/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/30/2021
Proposed Top PZ Location:Sec:12 Twp: 5N 67W Footage: 784 FSL  150 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67W Footage: 707 FSL  50 FWL
Proposed Depth/Form:18029 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2705 , Unit Acreage: 2564, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18029 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2031, Top: , Bottom: 18029 ft.

Wellbore Completed
Completion Date:10/7/2019
Spud Date:7/23/2019Spud Date Is:ACTUAL
Measured TD:17990 ft.Measured PB depth:17861 ft.
True Vertical TD:6903 ft.True Vertical PB depth:6904 ft.
Top PZ Location:Sec:12 Twp: 5N 67WFootage: 789 FSL  198 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67WFootage: 707 FSL  91 FWL
Log Types:MWD/LWD, CBL, Mud Log (RES/GR in API: 05-123-50256 & 05-123-50255)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1837 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1837 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17950 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2379, Top: 0 ft., Bottom: 17990 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3818 ft.NN
SUSSEX4368 ft.NN
SHANNON4976 ft.NN
SHARON SPRINGS7370 ft.NN
NIOBRARA7431 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/13/2020                 Interval Top: 7820 ft.    Interval Bottom: 17795 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/30/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/17/2020Treatment End Date:5/3/2020
Treatment Summary:56 Stage Plug and Perf Total Fluid: 163,157 bbls Gel Fluid: 95,571 bbls Slickwater Fluid: 66,895 bbls 15% HCl Acid: 691 bbls Total Proppant: 10,726,000 lbs Silica Proppant: 10,726,000 lbs Method for determining flowback: measuring flowback tank volume.
Total fluid used in treatment (bbls):163157Max pressure during treatment (psi):4472
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:56
Total acid used in treatment (bbls):691Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5983
Fresh water used in treatment (bbls):162466Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10726000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7351 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/13/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 103
BBLS_OIL 322
BTU_GAS 1334
CALC_BBLS_H2O 103
CALC_BBLS_OIL 322
CALC_GOR 1528
CALC_MCF_GAS 492
CASING_PRESS 1926
GRAVITY_OIL 52
MCF_GAS 492
TUBING_PRESS 1616
Perforation Data:
Interval Top:7820 ft.# Of Holes:2016
Interval Bottom:17795 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6255
Total Gas Produced (MCF)172260
GOR27539
GOR DeterminationMCFE
Average BOE per Day98.388
Average MCFE per Day570.669

 Federal Financial Assurance  i 

 Tribal Well  i No