Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-48929Guttersen
C28-715
NOBLE ENERGY INC
100322
PA
7/1/2025
WATTENBERG
90750
WELD  123
SWSE 33 4N64W 6
459542
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1915 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404152493Form 174/2/20254/3/2025 6DOWN TO 0 GAS0 NO FLOW 11281128No----GAS PRESENT AT START OF TEST,GAS BLEWDOWN IMMEDIATELY. WELL TREE’D DOWN NO TUBING
404101979Form 172/18/20252/20/2025 0DOWN TO 0 NONE0 NO FLOW 00No----CIWP 10 ON BH, OPEN BH BLOW DOWN TO 0, NO FLUID PRESENT
404082331Form 172/3/20252/5/2025 32DOWN TO 0 GAS0 NO FLOW 00No----GAS PRESENT AT START OF TEST,GAS BLEWDOWN IMMEDIATELY NOT ENOUGH TO SAMPLE
403848806Form 177/8/20247/9/2024 57CONTINUOUS GAS0 NO FLOW 967967YesYes--GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DONW TO ZERO. NO PSI NO FLOW AT END OF TEST. GAS SAMPLE COLLECTED. UNABLE TO GATHER PRODUCTION GAS SAMPLE DUE TO FLUID. UANBE TO COLLECT TUBING PRESSURE DUE TO BLUE FRAC VALVE.
403717548Form 173/12/20243/13/2024 144CONTINUOUS GAS0 NO FLOW 643643YesYes--GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DOWN TO ZERO. NO PSI NO FLOW AT END OF TEST.GAS SAMPLE COLLECTED. SURFACE KIT SHUT IN FOR 168HRS 0MIN PRIOR TO TEST UNABLE TO SAMPLE PRODUCTION CASING DUE TO FLUID. UNABLE TO COLEECT TUBING PRESSURE DUE TO BLUE FRAC VALVE
403695715Form 172/19/20242/22/2024 181CONTINUOUS GAS1 CONTINUOUS 729729YesYes--GAS PRESENT AT BEGINING OF TEST AND WAS CONTINUOUS TO END OF TEST. 1 PSI INSTANTANEOUS. SURFACE CASING GAS SAMPLE COLLECTED, NO PRODUCTION CASING GAS SAMPLED DUE TO LIQUID IN PRODUCTION CASING. TUBING UNABLE TO BE COLLECTED. SURFACE KIT WAS SHUT IN FOR 7 DAYS PRIOR TO TEST.
403507734Form 178/21/20238/24/2023 329CONTINUOUS GAS0 CONTINUOUS 965965YesYes--GAS PRESENT AT BEGINING OF TEST AND WAS CONTINUOUS TO END OF TEST. 1 PSI INSTANTANEOUS. SURFACE CASING GAS SAMPLE COLLECTED, NO PRODUCTION CASING GAS SAMPLED DUE TO LIQUID IN PRODUCTION CASING. TUBING UNABLE TO BE COLLECTED.
403452529Form 176/28/20237/3/2023 247CONTINUOUS GAS2 CONTINUOUS 00No----GAS PRESENT AT BEGINING OF TEST. GAS WAS CONTINUOUS. DID NOT BLOW DOWN TO ZERO. 2 PSI, FLOW AT THE END OF TEST. NO SAMPLE COLLECTED BECAUSE THERE WAS NO GAS ON PRODUCTION CASING.
403298620Form 171/20/20231/23/2023 757CONTINUOUS GAS30 CONTINUOUS 00No----GAS AND MUD WHOLE TEST. BLEWDOWN TO 13 PSI. SI PSI 30.
403266175Form 1712/18/202212/20/2022 0NO FLOW NONE110 NO FLOW 00No----30 MINUTE BRADENHEAD TEST PRE FRAC, SURFACE CASING HAS 110 PSI AFTER 30 MINUTE TEST. Surface casing was blown down prior to test to swap out gauges. COGCC engineer notified of high pressures on bradenhead.