| 404152493 | Form 17 | 4/2/2025 | 4/3/2025 | | 6 | DOWN TO 0 | GAS | 0 | NO FLOW | 1128 | 1128 | No | -- | -- | GAS PRESENT AT START OF TEST,GAS BLEWDOWN IMMEDIATELY.
WELL TREE’D DOWN NO TUBING |
| 404101979 | Form 17 | 2/18/2025 | 2/20/2025 | | 0 | DOWN TO 0 | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | CIWP 10 ON BH, OPEN BH BLOW DOWN TO 0, NO FLUID PRESENT |
| 404082331 | Form 17 | 2/3/2025 | 2/5/2025 | | 32 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | GAS PRESENT AT START OF TEST,GAS BLEWDOWN IMMEDIATELY NOT ENOUGH TO SAMPLE |
| 403848806 | Form 17 | 7/8/2024 | 7/9/2024 | | 57 | CONTINUOUS | GAS | 0 | NO FLOW | 967 | 967 | Yes | Yes | -- | GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DONW TO ZERO. NO PSI NO FLOW AT END OF TEST. GAS SAMPLE COLLECTED. UNABLE TO GATHER PRODUCTION GAS SAMPLE DUE TO FLUID. UANBE TO COLLECT TUBING PRESSURE DUE TO BLUE FRAC VALVE. |
| 403717548 | Form 17 | 3/12/2024 | 3/13/2024 | | 144 | CONTINUOUS | GAS | 0 | NO FLOW | 643 | 643 | Yes | Yes | -- | GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DOWN TO ZERO. NO PSI NO FLOW AT END OF TEST.GAS SAMPLE COLLECTED. SURFACE KIT SHUT IN FOR 168HRS 0MIN PRIOR TO TEST UNABLE TO SAMPLE PRODUCTION CASING DUE TO FLUID. UNABLE TO COLEECT TUBING PRESSURE DUE TO BLUE FRAC VALVE |
| 403695715 | Form 17 | 2/19/2024 | 2/22/2024 | | 181 | CONTINUOUS | GAS | 1 | CONTINUOUS | 729 | 729 | Yes | Yes | -- | GAS PRESENT AT BEGINING OF TEST AND WAS CONTINUOUS TO END OF TEST. 1 PSI INSTANTANEOUS. SURFACE CASING GAS SAMPLE COLLECTED, NO PRODUCTION CASING GAS SAMPLED DUE TO LIQUID IN PRODUCTION CASING. TUBING UNABLE TO BE COLLECTED. SURFACE KIT WAS SHUT IN FOR 7 DAYS PRIOR TO TEST. |
| 403507734 | Form 17 | 8/21/2023 | 8/24/2023 | | 329 | CONTINUOUS | GAS | 0 | CONTINUOUS | 965 | 965 | Yes | Yes | -- | GAS PRESENT AT BEGINING OF TEST AND WAS CONTINUOUS TO END OF TEST. 1 PSI INSTANTANEOUS. SURFACE CASING GAS SAMPLE COLLECTED, NO PRODUCTION CASING GAS SAMPLED DUE TO LIQUID IN PRODUCTION CASING. TUBING UNABLE TO BE COLLECTED. |
| 403452529 | Form 17 | 6/28/2023 | 7/3/2023 | | 247 | CONTINUOUS | GAS | 2 | CONTINUOUS | 0 | 0 | No | -- | -- | GAS PRESENT AT BEGINING OF TEST. GAS WAS CONTINUOUS. DID NOT BLOW DOWN TO ZERO. 2 PSI, FLOW AT THE END OF TEST. NO SAMPLE COLLECTED BECAUSE THERE WAS NO GAS ON PRODUCTION CASING. |
| 403298620 | Form 17 | 1/20/2023 | 1/23/2023 | | 757 | CONTINUOUS | GAS | 30 | CONTINUOUS | 0 | 0 | No | -- | -- | GAS AND MUD WHOLE TEST. BLEWDOWN TO 13 PSI. SI PSI 30. |
| 403266175 | Form 17 | 12/18/2022 | 12/20/2022 | | 0 | NO FLOW | NONE | 110 | NO FLOW | 0 | 0 | No | -- | -- | 30 MINUTE BRADENHEAD TEST PRE FRAC, SURFACE CASING HAS 110 PSI AFTER 30 MINUTE TEST. Surface casing was blown down prior to test to swap out gauges. COGCC engineer notified of high pressures on bradenhead.
|