| Click for Specifics | Full | 10/24/2025 | 10/27/2025 | | 0 | No Flow | -- | 0 | No Flow | 452 | 433 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 10/20/2024 | 10/22/2024 | | 0 | | -- | 0 | | 528 | 568 | No | No | No | |
| Click for Specifics | Full | 12/8/2023 | 12/11/2023 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 625 | 634 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/1/2022 | 2/21/2022 | | 1 | Down to Zero | -- | 0 | Down to Zero | 451 | 440 | No | No | No | |
| Click for Specifics | Full | 8/18/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 68 | 72 | No | None | None | |
| Click for Specifics | Light | 9/17/2020 | 12/3/2020 | | 6 | | -- | 0 | No Flow | 41 | 41 | No | No | No | |
| 402063536 | Form 17 | 5/31/2019 | 6/4/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2066 | 2066 | No | -- | -- | No gas, fluid or vapor. |
| 401909507 | Form 17 | 1/16/2019 | 1/17/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, gas or vapors. |