Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47696
Well Classification: OW Status: PR - 8/1/2019
Well Name/No:Bost Farm #8C-8-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2019
FacilityID:456990LocationID:456832
Municipality/County:GREELEY / WELD #123Location:SWNW 7 5N66W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1477FNL  939 FWLLat/Long: 40.417482 / -104.829014Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417481 / -104.829013Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2019
End Date: 4/12/2019
Reported: 6/12/2019
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2019             Measured TD: 17780 ft.    Vertical TD: 7378 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 2137 FNL  150 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 2100 FNL  460 FEL
Proposed Depth/Form:17686 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: S 7,8,11,12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17686 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2178, Top: , Bottom: 17686 ft.

Wellbore Completed
Completion Date:12/27/2018
Spud Date:9/27/2018Spud Date Is:ACTUAL
Measured TD:17780 ft.Measured PB depth:17658 ft.
True Vertical TD:7378 ft.True Vertical PB depth:7379 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 2144 FNL  152 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 2095 FNL  395 FEL
Log Types:MWD/LWD, CBL, Mud Log(RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1807 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 718, Top: 0 ft., Bottom: 1807 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17743 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2429, Top: 950 ft., Bottom: 17702 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3707 ft.NN
SUSSEX4253 ft.NN
SHANNON4852 ft.NN
SHARON SPRINGS7075 ft.NN
NIOBRARA7119 ft.NN
FORT HAYS7689 ft.NN
CODELL7803 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/4/2020                  Interval Top: 8619 ft.    Interval Bottom: 8923 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/4/2020Treatment End Date:N/A
Treatment Summary:Perforated interval: 8619'-8923'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8619 ft.# Of Holes:1728
Interval Bottom:8923 ft.Hole Size:0.46 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 7/30/2019                 Interval Top: 7757 ft.    Interval Bottom: 17588 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/11/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2019Treatment End Date:4/12/2019
Treatment Summary:Plug and perf completion type, 48 stages. 220258 bbl of slickwater and gel. 48 bbl of 15% HCL acid used. 9020438 lbs proppant: 292915 lbs of 100 mesh, 409606 lbs 20/40, 8317917 lbs 40/70 proppant.
Total fluid used in treatment (bbls):220306Max pressure during treatment (psi):7461
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4321
Fresh water used in treatment (bbls):220258Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9020438Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:21.375 in.Tubing Setting Depth:7378 ft.
Tubing Packer Depth:7356 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/30/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 337
BBLS_OIL 371
BTU_GAS 1000
CALC_BBLS_H2O 337
CALC_BBLS_OIL 371
CALC_GOR 3375
CALC_MCF_GAS 1252
CASING_PRESS 50
GRAVITY_OIL 49
MCF_GAS 1252
TUBING_PRESS 1608
Perforation Data:
Interval Top:7757 ft.# Of Holes:1728
Interval Bottom:17588 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/4/2020                  Interval Top: 7757 ft.    Interval Bottom: 17588 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/4/2020Treatment End Date:N/A
Treatment Summary:Perforated interval: 7757'-8573', 8971'-17588'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7757 ft.# Of Holes:1728
Interval Bottom:17588 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6765
Total Gas Produced (MCF)124370
GOR18384
GOR DeterminationMCFE
Average BOE per Day77.301
Average MCFE per Day448.346

 Federal Financial Assurance  i 

 Tribal Well  i No