| 404554651 | Form 17 | 2/11/2026 | 2/23/2026 | PLUNGER LIFT | 40 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 286 | 289 | No | -- | -- | |
| 404129157 | Form 17 | 2/27/2025 | 3/14/2025 | SHUT-IN | 41 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 400 | 400 | No | -- | -- | Remediation follow up test. 41 PSI continuous gas and water flow blew down to 1 PSI within thirty minutes. Gas and water observed throughout the entire test, ~5 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403728715 | Form 17 | 3/18/2024 | 3/22/2024 | PLUNGER LIFT | 37 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 330 | 332 | No | -- | -- | Annual test. 37 PSI water and gas flow blew down to 0 PSI in seconds, water continued to drip for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403350597 | Form 17 | 3/13/2023 | 3/20/2023 | PLUNGER LIFT | 22 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 312 | 320 | No | -- | -- | Annual Test. 22 PSI water and gas flow blew down to 0 PSI within first few seconds of test. Water trickled the entire test. PDC will continue to monitor monthly. |
| 403216558 | Form 17 | 11/1/2022 | 11/2/2022 | PLUNGER LIFT | 41 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 275 | 274 | No | -- | -- | Abatement system follow up test. 41 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402984454 | Form 17 | 3/14/2022 | 3/15/2022 | PLUNGER LIFT | 62 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 262 | 262 | Yes | -- | -- | Annual Test, 62 PSI slight gas, continuous water flow blew down to 0 PSI within 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402816079 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 33 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 368 | 370 | No | -- | -- | Abatement system follow up test, 33 PSI water flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402670325 | Form 17 | 4/19/2021 | 4/26/2021 | | 76 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 463 | 460 | Yes | -- | -- | Annual Test 76 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402769825 | Form 17 | 9/22/2020 | 8/4/2021 | FLOWING | 12 | DOWN TO 0 | -- | 0 | NO FLOW | 441 | 441 | No | -- | -- | Abatement system follow up test, 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402448538 | Form 17 | 4/28/2020 | 7/22/2020 | | 117 | WATER H20 | -- | 20 | WATER H20 | 521 | 525 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402440427 | Form 17 | 3/31/2020 | 7/9/2020 | | 891 | GAS | -- | 0 | WHISPER | 759 | 759 | Yes | -- | -- | Annual Test 891 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402236661 | Form 17 | 11/7/2019 | 11/12/2019 | FLOWING | 84 | GAS | -- | 8 | WHISPER | 724 | 724 | Yes | Yes | -- | Annual Test 84 PSI slight gas flow blew down to a whisper for the entire 30 min test. 8 PI at the end of the test. PDC has collected a sample and will submit via form 43 when results are available. PDC will submit a remediation plan vi sundry. |