|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 12226 ft. Vertical TD: 6917 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/4/2020 | | Proposed Top PZ Location: | Sec:11 Twp: 5N 65W | Footage: 229 FSL 2296 FWL | | Bottom Hole Location: | Sec:11 Twp: 5N 65W | Footage: 500 FNL 2306 FWL | | Proposed Depth/Form: | 12259 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 920, Top: 0 ft., Bottom: 1600 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12259 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2035, Top: 0 ft., Bottom: 12259 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/24/2018 | | Spud Date: | 7/18/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 12226 ft. | Measured PB depth: | 12203 ft. | | True Vertical TD: | 6917 ft. | True Vertical PB depth: | 6918 ft. | | Top PZ Location: | Sec:11 Twp: 5N 65W | Footage: 229 FSL 2296 FWL | | Bottom Hole Location: | Sec:11 Twp: 5N 65W | Footage: 500 FNL 2306 FWL | | Log Types: | CBL, MWD (DIL in 123-12759) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1677 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 780, Top: 0 ft., Bottom: 1677 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12219 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1598, Top: 2480 ft., Bottom: 12226 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3586 ft. | | | | | SUSSEX | 4271 ft. | | | | | SHANNON | 4973 ft. | | | | | SHARON SPRINGS | 6681 ft. | | | | | NIOBRARA | 6733 ft. | | | | | FORT HAYS | 7229 ft. | | | | | CODELL | 7439 ft. | | | | | CARLILE | 10168 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 11/1/2019 Interval Top: 10168 ft. Interval Bottom: 10815 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/1/2019 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 10,168'-10,316', 10,706'-10,815' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 10168 ft. | # Of Holes: | 684 | | Interval Bottom: | 10815 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/1/2019 Interval Top: 8082 ft. Interval Bottom: 12094 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/1/2019 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8,082'-9,533', 11,711'-12,094' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8082 ft. | # Of Holes: | 684 | | Interval Bottom: | 12094 ft. | Hole Size: | 0.42 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 7619 ft. Interval Bottom: 12219 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 12/3/2018 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/20/2018 | Treatment End Date: | 10/25/2018 | | Treatment Summary: | 20 Stage Plug and Perf
Total Fluid: 72,871 bbls
Gel Fluid: 53,664 bbls
Slickwater Fluid: 18,649 bbls
15% HCl Acid: 558 bbls
Total Proppant: 3,872,840 lbs
Silica Proppant: 3,872,840 lbs
Method for determining flowback: measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 72871 | Max pressure during treatment (psi): | 4336 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | 558 | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 4251 | | Fresh water used in treatment (bbls): | 72313 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3872840 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7059 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/9/2018 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 120 | | BBLS_OIL | 216 | | BTU_GAS | 1251 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 216 | | CALC_GOR | 4199 | | CALC_MCF_GAS | 907 | | CASING_PRESS | 2013 | | GRAVITY_OIL | 47 | | MCF_GAS | 907 | | TUBING_PRESS | 1321 |
| | Perforation Data: | | Interval Top: | 7619 ft. | # Of Holes: | 684 | | Interval Bottom: | 12219 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/1/2019 Interval Top: 7619 ft. Interval Bottom: 12219 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/1/2019 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 7,619'-8,082', 9,533'-10,168', 10,316'-10,706', 10,815'-11,711', 12,094'-12,219' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7619 ft. | # Of Holes: | 684 | | Interval Bottom: | 12219 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1711 |
| Total Gas Produced (MCF) | 14304 |
| GOR | 8360 |
| GOR Determination | BOE |
| Average BOE per Day | 11.443 |
| Average MCFE per Day | 66.375 |
| Federal Financial Assurance | i | |
|
|