Click for Specifics | Full | 7/31/2024 | 8/6/2024 | | 0 | No Flow | -- | 0 | No Flow | 313 | 312 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/19/2023 | 9/25/2023 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 348 | 347 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/6/2022 | 10/10/2022 | | 5 | Down to Zero | -- | 0 | No Flow | 350 | 350 | No | None | None | |
Click for Specifics | Full | 4/16/2021 | 11/1/2021 | | 0 | Gas | -- | 0 | No Flow | 499 | 493 | No | None | None | |
402423941 | Form 17 | 4/11/2020 | 6/16/2020 | | 2 | WATER H20 | -- | 0 | NO FLOW | 764 | 763 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
Click for Specifics | Light | 3/29/2020 | 5/11/2020 | | 9 | | -- | 9 | | 780 | 780 | No | No | No | |
402034290 | Form 17 | 4/26/2019 | 5/7/2019 | FLOWING | 78 | DOWN TO 0 | -- | 0 | NO FLOW | 2115 | 2115 | No | -- | -- | 78 PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
401613078 | Form 17 | 4/12/2018 | 4/18/2018 | SHUT-IN | 20 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test 20 PSI blew down to 0 instantly no flow or pressure for remainder of test |