Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44087
Well Classification: OW Status: PR - 4/7/2019
Well Name/No:Bunting #26Q-212
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/7/2019
FacilityID:448958LocationID:448963
County:WELD #123Location:SWSE 26 5N65W 6
Field:WATTENBERG - #90750Elevation:4649 ft.
Planned Location:775FSL  2405 FELLat/Long: 40.365140 / -104.629620Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.365140 / -104.629620Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/7/2019
End Date: 2/20/2019
Reported: 1/26/2022
Originally Reported: 3/19/2019
Days to report: 1071
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/7/2019             Measured TD: 15120 ft.    Vertical TD: 6721 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/17/2019
Proposed Top PZ Location:Sec:26 Twp: 5N 65W Footage: 492 FSL  2420 FEL
Bottom Hole Location:Sec:25 Twp: 5N 65W Footage: 560 FSL  101 FEL
Proposed Depth/Form:14928 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14928 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 14928 ft.

Wellbore Completed
Completion Date:2/2/2018
Spud Date:1/26/2018Spud Date Is:ACTUAL
Measured TD:15120 ft.Measured PB depth:15101 ft.
True Vertical TD:6721 ft.True Vertical PB depth:6721 ft.
Top PZ Location:Sec:26 Twp: 5N 65WFootage: 492 FSL  2420 FEL
Bottom Hole Location:Sec:25 Twp: 5N 65WFootage: 560 FSL  101 FEL
Log Types:CBL, MWD, (DIL in 123-16715 & 123-30703)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1669 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 1669 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15115 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2500, Top: 187 ft., Bottom: 15120 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3615 ft.
SUSSEX4371 ft.
SHARON SPRINGS6677 ft.
NIOBRARA6874 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/7/2019                  Interval Top: 7514 ft.    Interval Bottom: 15115 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/27/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/7/2019Treatment End Date:2/20/2019
Treatment Summary:43 Stage Plug and Perf Total Fluid: 144,405 bbls Gel Fluid: 107,738 bbls Slickwater Fluid: 35,228 bbls 15% HCl Acid: 1,439 bbls Total Proppant: 6,548,900 lbs Silica Proppant: 6,548,900 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):144405Max pressure during treatment (psi):4747
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):1439Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3832
Fresh water used in treatment (bbls):142966Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6548900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6964 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 195
BBLS_OIL 413
BTU_GAS 1310
CALC_BBLS_H2O 195
CALC_BBLS_OIL 413
CALC_GOR 4341
CALC_MCF_GAS 1793
CASING_PRESS 2408
GRAVITY_OIL 57
MCF_GAS 1793
TUBING_PRESS 1645
Perforation Data:
Interval Top:7514 ft.# Of Holes:1518
Interval Bottom:15115 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)5487
Total Gas Produced (MCF)129267
GOR23558
GOR DeterminationMCFE
Average BOE per Day76.013
Average MCFE per Day440.867

 Federal Financial Assurance  i 

 Tribal Well  i No