Click for Specifics | Full | 8/1/2024 | 8/6/2024 | | 0 | No Flow | -- | 0 | No Flow | 453 | 453 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 9/19/2023 | 9/25/2023 | Shut In | 13 | Down to Zero | -- | 0 | Down to Zero | 639 | 639 | No | No | No | Annual Test. 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403194177 | Form 17 | 9/6/2022 | 10/11/2022 | PLUNGER LIFT | 34 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 333 | 332 | Yes | -- | -- | Annual Test. 34 PSI water and gas flow blew down to 0 PSI within first minute of test. Water present for the entire test. PDC collected a sample 8/2/2022. PDC will continue to monitor monthly. |
Click for Specifics | Full | 4/16/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 509 | 512 | No | None | None | |
402447674 | Form 17 | 4/11/2020 | 7/21/2020 | | 113 | WATER H20 | -- | 5 | WATER H20 | 812 | 812 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402034300 | Form 17 | 4/26/2019 | 5/7/2019 | FLOWING | 99 | DOWN TO 0 | -- | 0 | NO FLOW | 2684 | 2684 | No | -- | -- | 99 PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure.
|
402016522 | Form 17 | 4/13/2018 | 4/22/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test no flow or pressure for duration of test |