|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 10/1/2023 Measured TD: 14722 ft. Vertical TD: 6828 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 10/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/17/2019 | Proposed Top PZ Location: | Sec:26 Twp: 5N 65W | Footage: 409 FSL 2618 FWL | Bottom Hole Location: | Sec:27 Twp: 5N 65W | Footage: 335 FSL 502 FWL | Proposed Depth/Form: | 15052 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 920, Top: 0 ft., Bottom: 1600 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15052 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2035, Top: 0 ft., Bottom: 15052 ft. |
| | |
Wellbore Completed | Completion Date: | 2/17/2018 | Spud Date: | 2/9/2018 | Spud Date Is: | ACTUAL | Measured TD: | 14722 ft. | Measured PB depth: | 14705 ft. | True Vertical TD: | 6828 ft. | True Vertical PB depth: | 6828 ft. | Top PZ Location: | Sec:26 Twp: 5N 65W | Footage: 409 FSL 2618 FWL | Bottom Hole Location: | Sec:27 Twp: 5N 65W | Footage: 335 FSL 502 FWL | Log Types: | CBL, MWD, (DIL in 123-16715 & 123-30703) | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1628 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 790, Top: 0 ft., Bottom: 1628 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14721 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1555, Top: 2562 ft., Bottom: 14722 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3643 ft. | | | | SUSSEX | 4332 ft. | | | | SHARON SPRINGS | 6580 ft. | | | | NIOBRARA | 6731 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 10/1/2023 Interval Top: 7288 ft. Interval Bottom: 14721 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/29/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 2/7/2019 | Treatment End Date: | 2/20/2019 | Treatment Summary: | 42 Stage Plug and Perf
Total Fluid: 143,626 bbls
Gel Fluid: 112,966 bbls
Slickwater Fluid: 29,519 bbls
15% HCl Acid: 1,141
Total Proppant: 7,747,000 lbs
Silica Proppant: 7,747,000 lbs
Method for determining flowback: measuring flowback tank volumes. | Total fluid used in treatment (bbls): | 143626 | Max pressure during treatment (psi): | 4853 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 42 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.93 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3201 | Fresh water used in treatment (bbls): | 142485 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 7747000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6901 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/6/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 183 | BBLS_OIL | 369 | BTU_GAS | 1310 | CALC_BBLS_H2O | 183 | CALC_BBLS_OIL | 369 | CALC_GOR | 5615 | CALC_MCF_GAS | 2072 | CASING_PRESS | 3053 | GRAVITY_OIL | 57 | MCF_GAS | 2072 | TUBING_PRESS | 2469 |
| Perforation Data: | Interval Top: | 7288 ft. | # Of Holes: | 1482 | Interval Bottom: | 14721 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 03/31/2029 |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 01/29/2025 |
Defined Inactive (SI ) | Y | Defined Inactive 09/30/2023 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|