Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-43449Alles
22I-321
PDC ENERGY INC
69175
PR
5/1/2019
WATTENBERG
90750
WELD  123
NESE 22 5N65W 6
327103
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1680 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsLight7/2/20257/7/2025 0 --0 00NoNoNo 
Click for SpecificsFull7/9/20247/15/2024 0Down to Zero--0Down to Zero293290NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
403310122Form 172/1/20232/2/2023PLUNGER LIFT5DOWN TO 0 GAS0 NO FLOW 286284No----Abatement system follow up test. 5 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull5/25/20226/13/2022 10Down to Zero--0Down to Zero276276NoNoneNone 
Click for SpecificsFull9/5/202111/1/2021 0No Flow--0No Flow324330NoNoneNone 
402425970Form 174/15/20206/18/2020 0NO FLOW --0 NO FLOW 450450No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402080962Form 174/15/20196/19/2019SHUT-IN120CONTINUOUS --0 VAPOR 11571157No----Annual Test 120 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
401327563Form 176/15/20176/29/2017FLOWING380CONTINUOUS --0 NO FLOW 22652266No----Post Production Tests. Initial pressure at start of test was3800 PSI, pressure blew down to 0 within first 15 minutes of test and remained at 0 for the duration of test. No sample collected.
401247131Form 173/29/20173/30/2017SHUT-IN0NO FLOW --0 NO FLOW 300300No----All sleeves are open due to the toe prep