Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43449
Well Classification: OW Status: PR - 5/1/2019
Well Name/No:Alles #22I-321
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2019
FacilityID:447012LocationID:327103
County:WELD #123Location:NESE 22 5N65W 6
Field:WATTENBERG - #90750Elevation:4645 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2212FSL  349 FELLat/Long: 40.383577 / -104.641153Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.383574 / -104.641153Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/21/2017
End Date: 5/1/2017
Reported: 6/6/2017
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2019             Measured TD: 14803 ft.    Vertical TD: 6864 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/27/2018
Proposed Top PZ Location:Sec:23 Twp: 5N 65W Footage: 2479 FSL  449 FWL
Bottom Hole Location:Sec:14 Twp: 5N 65W Footage: 500 FNL  460 FWL
Proposed Depth/Form:14786 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14786 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 14786 ft.

Wellbore Completed
Completion Date:2/12/2017
Spud Date:2/4/2017Spud Date Is:ACTUAL
Measured TD:14803 ft.Measured PB depth:14784 ft.
True Vertical TD:6864 ft.True Vertical PB depth:6864 ft.
Top PZ Location:Sec:23 Twp: 5N 65WFootage: 2479 FSL  449 FWL
Bottom Hole Location:Sec:14 Twp: 5N 65WFootage: 500 FNL  460 FWL
Log Types:CBL, MWD, (DIL in 123-14163)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1680 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 1680 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14797 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2430, Top: 1050 ft., Bottom: 14797 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3667 ft.
SUSSEX4252 ft.
SHANNON5014 ft.
SHARON SPRINGS6600 ft.
NIOBRARA6781 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2019                  Interval Top: 7198 ft.    Interval Bottom: 14720 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/17/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2017Treatment End Date:5/1/2017
Treatment Summary:45 Stage Plug and Perf, Perf'd from 7,198'-14,571'; 1 toe sleeve at 14,720' Total Fluid: 161,953 bbls Gel Fluid: 91,965 bbls Slickwater Fluid: 68,711 bbls HCl 15: 1,277 bbls Total Proppant: 8,134,840 lbs Silica Proppant: 8,134,840 lbs Method for determinng flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):161953Max pressure during treatment (psi):4367
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:45
Total acid used in treatment (bbls):1277Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8635
Fresh water used in treatment (bbls):160676Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8134840Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7034 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 234
BBLS_OIL 395
BTU_GAS 1267
CALC_BBLS_H2O 234
CALC_BBLS_OIL 395
CALC_GOR 3668
CALC_MCF_GAS 1449
CASING_PRESS 2543
GRAVITY_OIL 52
MCF_GAS 1449
TUBING_PRESS 1774
Perforation Data:
Interval Top:7198 ft.# Of Holes:1944
Interval Bottom:14720 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)5791
Total Gas Produced (MCF)93873
GOR16210
GOR DeterminationMCFE
Average BOE per Day59.953
Average MCFE per Day347.734

 Federal Financial Assurance  i 

 Tribal Well  i No