| 404285592 | Form 17 | 6/30/2025 | 7/18/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 366 | 366 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404058885 | Form 17 | 1/10/2025 | 1/15/2025 | PLUNGER LIFT | 57 | DOWN TO 0 | GAS | 0 | NO FLOW | 283 | 283 | No | -- | -- | Engineering Ad Hoc test. 57 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/8/2024 | 4/1/2024 | | 0 | No Flow | -- | 0 | No Flow | 275 | 274 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/15/2023 | 3/27/2023 | | 0 | No Flow | -- | 0 | No Flow | 282 | 271 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/15/2022 | 4/18/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 285 | 289 | No | No | No | |
| 402816029 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 316 | 319 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402789441 | Form 17 | 4/21/2021 | 8/24/2021 | PUMPING | 1 | WHISPER | GAS | 0 | NO FLOW | 326 | 326 | No | -- | -- | Annual Test, 1 PSI whisper gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402425813 | Form 17 | 4/27/2020 | 6/18/2020 | | 10 | GAS | -- | 0 | WHISPER | 444 | 440 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402270220 | Form 17 | 12/15/2019 | 12/23/2019 | FLOWING | 134 | GAS | -- | 2 | WHISPER | 555 | 555 | Yes | Yes | -- | Annual TEst 134 PSI slight gas whisper flow observed throughout test. Blew down to 2 PSI at the end of the test. PDC has collected a sample and will submit results via form 43 when available. PDC will submit a remediation plan via sundry. |
| 401347270 | Form 17 | 7/2/2017 | 7/19/2017 | FLOWING | 380 | CONTINUOUS | -- | 150 | CONTINUOUS | 2095 | 2090 | Yes | Yes | -- | Second Post Production test, intitial pressure580 PSI continous flow for duration of test. Prodction and bradenhead gas sample collected. Will blow down and monitor pressure over 7 day period. |
| 401236949 | Form 17 | 2/22/2017 | 3/20/2017 | SHUT-IN | 900 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |