Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-43388Clark
14J-223
PDC ENERGY INC
69175
PR
7/1/2024
WATTENBERG
90750
WELD  123
NWNE 14 5N65W 6
323242
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1553 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404285592Form 176/30/20257/18/2025PLUNGER LIFT0NO FLOW NONE0 NO FLOW 366366No----Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy.
404058885Form 171/10/20251/15/2025PLUNGER LIFT57DOWN TO 0 GAS0 NO FLOW 283283No----Engineering Ad Hoc test. 57 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull3/8/20244/1/2024 0No Flow--0No Flow275274NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull3/15/20233/27/2023 0No Flow--0No Flow282271NoNoneNoneAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly.
Click for SpecificsFull3/15/20224/18/2022 0Down to Zero--0Down to Zero285289NoNoNo 
402816029Form 179/15/20219/20/2021PLUNGER LIFT0NO FLOW --0 NO FLOW 316319No----Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402789441Form 174/21/20218/24/2021PUMPING1WHISPER GAS0 NO FLOW 326326No----Annual Test, 1 PSI whisper gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
402425813Form 174/27/20206/18/2020 10GAS --0 WHISPER 444440No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402270220Form 1712/15/201912/23/2019FLOWING134GAS --2 WHISPER 555555YesYes--Annual TEst 134 PSI slight gas whisper flow observed throughout test. Blew down to 2 PSI at the end of the test. PDC has collected a sample and will submit results via form 43 when available. PDC will submit a remediation plan via sundry.
401347270Form 177/2/20177/19/2017FLOWING380CONTINUOUS --150 CONTINUOUS 20952090YesYes--Second Post Production test, intitial pressure580 PSI continous flow for duration of test. Prodction and bradenhead gas sample collected. Will blow down and monitor pressure over 7 day period.
401236949Form 172/22/20173/20/2017SHUT-IN900GAS --0 NO FLOW 00No----